{
  "schema": "aibast-manual-build-evidence/1.0",
  "captured_at": "2026-10-07T03:44:26.325896Z",
  "solution": "@aibast-agents-library/asset-maintenance-forecast",
  "status": "passed",
  "environment": {
    "name": "kodyv8",
    "id": "ee67a404-325c-e726-a18a-886fe708ca0b"
  },
  "manual_agent": {
    "display_name": "Asset Maintenance Manual",
    "bot_id": "5f6263c9-1539-4ecd-a820-c07abf353cc7",
    "created": true
  },
  "target_model": "Claude Opus 5",
  "model_confirmed": true,
  "manual_components": {
    "global_instructions": {
      "expected": true,
      "confirmed": true
    },
    "web_search_removed": {
      "expected": true,
      "confirmed": true
    },
    "knowledge_files": {
      "expected": 2,
      "confirmed": 2
    },
    "skills": {
      "expected": 4,
      "confirmed": 4
    },
    "tools": {
      "expected": 0,
      "confirmed": 0
    }
  },
  "canonical_preview": [
    {
      "case_id": "ASSET_MAINTENANCE_FORECAST-01",
      "prompt": "I need immediate analysis on our wind farm turbines",
      "must_include": [
        "Unit 12",
        "8.7/10",
        "March 18-22"
      ],
      "must_not_include": [],
      "expected_screenshot": "14-asset_maintenance_forecast-01.jpg",
      "passed": true
    },
    {
      "case_id": "ASSET_MAINTENANCE_FORECAST-02",
      "prompt": "Show me the weakest turbine condition and whether this is an operating authorization.",
      "must_include": [
        "Unit 12",
        "CRITICAL",
        "not a safety determination"
      ],
      "must_not_include": [],
      "expected_screenshot": "15-asset_maintenance_forecast-02.jpg",
      "passed": true
    },
    {
      "case_id": "ASSET_MAINTENANCE_FORECAST-03",
      "prompt": "What maintenance funding should I reserve for the at-risk turbines?",
      "must_include": [
        "$70,200",
        "$227,000",
        "Synthetic planning estimate"
      ],
      "must_not_include": [],
      "expected_screenshot": "16-asset_maintenance_forecast-03.jpg",
      "passed": true
    },
    {
      "case_id": "ASSET_MAINTENANCE_FORECAST-04",
      "prompt": "Draft the bundled maintenance plan for the at-risk turbines, but do not create any work orders.",
      "must_include": [
        "Bundled Maintenance Plan",
        "258%",
        "No work order"
      ],
      "must_not_include": [],
      "expected_screenshot": "17-asset_maintenance_forecast-04.jpg",
      "passed": true
    }
  ],
  "browserfilm": {
    "status": "captured",
    "manifest": "solutions/asset-maintenance-forecast/screenshots/manual/browserfilm.json",
    "gif": "solutions/asset-maintenance-forecast/screenshots/manual/manual-build-walkthrough.gif",
    "contact_sheet": "solutions/asset-maintenance-forecast/screenshots/manual/manual-build-contact-sheet.jpg"
  },
  "publication_gate": {
    "required_state": "Draft",
    "published": false,
    "confirmation_screenshot": "18-confirm-draft.jpg"
  }
}
