{
  "schema": "aibast-manual-build-evidence/1.0",
  "captured_at": "2026-10-08T03:45:17.576483Z",
  "solution": "@aibast-agents-library/build-materials-compliance",
  "status": "passed",
  "environment": {
    "name": "kodyv8",
    "id": "ee67a404-325c-e726-a18a-886fe708ca0b"
  },
  "manual_agent": {
    "display_name": "Build Materials Manual",
    "bot_id": "35fba4c5-838f-49cb-9a54-95109225ea2c",
    "created": true
  },
  "target_model": "Claude Opus 5",
  "model_confirmed": true,
  "manual_components": {
    "global_instructions": {
      "expected": true,
      "confirmed": true
    },
    "web_search_removed": {
      "expected": true,
      "confirmed": true
    },
    "knowledge_files": {
      "expected": 2,
      "confirmed": 2
    },
    "skills": {
      "expected": 6,
      "confirmed": 6
    },
    "tools": {
      "expected": 0,
      "confirmed": 0
    }
  },
  "canonical_preview": [
    {
      "case_id": "BM-01",
      "prompt": "What changed on our approved bills of materials this week?",
      "must_include": [
        "2 new lines and 2 quantity changes",
        "Riverside Main Replacement",
        "New this week"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "18-bm-01.jpg",
      "passed": true
    },
    {
      "case_id": "BM-02",
      "prompt": "Is anything newly out of compliance, and why?",
      "must_include": [
        "2 newly non-compliant",
        "Vendor certificate expired 2026-09-30",
        "final assembly moved to a non-qualifying plant"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "19-bm-02.jpg",
      "passed": true
    },
    {
      "case_id": "BM-03",
      "prompt": "Find me a compliant replacement for the gate valve with the same spec.",
      "must_include": [
        "GV-08B",
        "Contoso Pipe & Valve",
        "certificate current to 2027-03-31"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "20-bm-03.jpg",
      "passed": true
    },
    {
      "case_id": "BM-04",
      "prompt": "Which vendor certificates have lapsed or are about to?",
      "must_include": [
        "3 vendors need a certificate renewal",
        "Adatum Steel",
        "Expired"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "21-bm-04.jpg",
      "passed": true
    },
    {
      "case_id": "BM-05",
      "prompt": "Are we ready if the program auditor asks for our evidence package?",
      "must_include": [
        "evidence is complete for 1 of 7",
        "Not ready",
        "Hillcrest Pump Station"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "22-bm-05.jpg",
      "passed": true
    },
    {
      "case_id": "BM-06",
      "prompt": "I approve the hold, the GV-08B substitution and the vendor follow-ups. Prepare the drafts.",
      "must_include": [
        "5 drafts prepared",
        "Nothing was sent",
        "Substitution change request"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "23-bm-06.jpg",
      "passed": true
    }
  ],
  "browserfilm": {
    "status": "captured",
    "manifest": "solutions/build-materials-compliance/screenshots/manual/browserfilm.json",
    "gif": "solutions/build-materials-compliance/screenshots/manual/manual-build-walkthrough.gif",
    "contact_sheet": "solutions/build-materials-compliance/screenshots/manual/manual-build-contact-sheet.jpg"
  },
  "publication_gate": {
    "required_state": "Draft",
    "published": false,
    "confirmation_screenshot": "24-confirm-draft.jpg"
  }
}
