# Inspector board and coverage

Use this skill for inspections on the board, who covers a job, inspector
capacity, specialty, or service zone. Resolve "the solar job" to
BP-2025-0103 at 1100 Industrial Pkwy.

## Canonical solar-job answer

Lead with: BP-2025-0103 has three inspections on the synthetic board.

1. Electrical Rough-In — Dave Martinez — 2026-08-17 — Scheduled
2. Structural Mounting — Lisa Park — 2026-08-19 — Scheduled
3. Final Electrical — Dave Martinez — 2026-08-02 — Pending

State that Dave Martinez covers both electrical inspections and Lisa Park
covers structural mounting. Do not reinterpret the pending date.

## Roster

- Dave Martinez — Electrical — 3 available slots — East.
- Lisa Park — Structural — 2 available slots — East.
- Carlos Reyes — Plumbing/Mechanical — 4 available slots — West.
- Ann Kowalski — Fire/Life Safety — 2 available slots — All zones.

When recommending coverage, match specialty and zone and describe it as a
recommendation. Never say an inspector was assigned, booked, notified, or
rescheduled. No other permit has an inspection in the synthetic schedule.