AAIBAST manual workshop
Academy / Emissions Tracking Agent
Watch the manual film Back to workshopDownload source bundle

Manual mode · literal browser construction

Build Emissions Tracking Agent manually.

No PAC CLI, YAML import, or plugin architect. Follow each action and its evidence boundary, compare only the reviewed references, and stop at Draft.

Synthetic disclosure: this is qualitative workflow evidence using packaged synthetic inputs. It is not a customer KPI or a live-system result.

Build and verify

1

Create a blank Copilot Studio agent

Step 1 of 20

Action
Create a blank Copilot Studio agent
Expected resultA blank Copilot Studio agent is visible in the captured Draft workspace.
Create a blank Copilot Studio agent reviewed visual reference

Positive visual checkpoint: Untitled Agent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

2

Name Emissions Tracking Manual

Step 2 of 20

Action
Name Emissions Tracking Manual
Expected resultThe page header shows the recorded manual build name: Emissions Tracking Manual.
Name Emissions Tracking Manual reviewed visual reference

Positive visual checkpoint: Emissions Tracking Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

3

Enter the reviewed global instructions

Step 3 of 20

Action
Enter the reviewed global instructions
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Enter the reviewed global instructions reviewed visual reference

Positive visual checkpoint: Emissions Tracking Agent — Manual Global Instruc. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

4

Save the instruction policy

Step 4 of 20

Action
Save the instruction policy
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Save the instruction policy reviewed visual reference

Positive visual checkpoint: Draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

5

Remove default web search

Step 5 of 20

Action
Remove default web search
Expected resultThe captured inventory no longer lists the default web-search capability.
Remove default web search reviewed visual reference

Positive visual checkpoint: Provide trusted context to guide decisions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

6

Add knowledge: emission-tracking-rules-and-controls.md

Step 6 of 20

Action
Add knowledge: emission-tracking-rules-and-controls.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: emission-tracking-rules-and-controls.md reviewed visual reference

Positive visual checkpoint: emission-tracking-rules-and-controls.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

7

Add knowledge: emission-tracking-synthetic-records.md

Step 7 of 20

Action
Add knowledge: emission-tracking-synthetic-records.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: emission-tracking-synthetic-records.md reviewed visual reference

Positive visual checkpoint: emission-tracking-synthetic-records.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

8

Add skill: aibast_carbon-offset-analysis_04

Step 8 of 20

Action
Add skill: aibast_carbon-offset-analysis_04
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_carbon-offset-analysis_04 reviewed visual reference

Positive visual checkpoint: emission-tracking-carbon-offset-analysis. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

9

Add skill: aibast_compliance-status_02

Step 9 of 20

Action
Add skill: aibast_compliance-status_02
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_compliance-status_02 reviewed visual reference

Positive visual checkpoint: emission-tracking-compliance-status. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

10

Add skill: aibast_emissions-dashboard_01

Step 10 of 20

Action
Add skill: aibast_emissions-dashboard_01
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_emissions-dashboard_01 reviewed visual reference

Positive visual checkpoint: emission-tracking-emissions-dashboard. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

11

Add skill: aibast_implementation-roadmap_05

Step 11 of 20

Action
Add skill: aibast_implementation-roadmap_05
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_implementation-roadmap_05 reviewed visual reference

Positive visual checkpoint: emission-tracking-implementation-roadmap. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

12

Add skill: aibast_reduction-plan_03

Step 12 of 20

Action
Add skill: aibast_reduction-plan_03
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_reduction-plan_03 reviewed visual reference

Positive visual checkpoint: emission-tracking-reduction-plan. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

13

Review model, skills, knowledge, and safety boundaries

Step 13 of 20

Action
Review model, skills, knowledge, and safety boundaries
Expected resultThe screenshot visibly confirms Claude Opus 5, 5 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Review model, skills, knowledge, and safety boundaries reviewed visual reference

Positive visual checkpoint: Claude Opus 5; emission-tracking-reduction-plan; emission-tracking-implementation-roadmap; emission-tracking-emissions-dashboard; emission-tracking-compliance-status; emission-tracking-carbon-offset-analysis; emission-tracking-synthetic-records.md; emission-tracking-rules-and-controls.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

14

Open a fresh Preview conversation

Step 14 of 20

Action
Open a fresh Preview conversation
Expected resultA fresh Preview surface or its recorded qualitative result is visible; only the evidence file defines a pass.
Open a fresh Preview conversation reviewed visual reference

Positive visual checkpoint: Emissions Tracking Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

15

Pass EMISSION_TRACKING-01: Emissions Data Analyst

Step 15 of 20

Action
Pass EMISSION_TRACKING-01: Emissions Data Analyst
Expected resultThe captured Preview evidence records EMISSION_TRACKING-01 with the recorded identifiers 47,340, Boston Hub, not verified emissions evidence; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running EMISSION_TRACKING-01. A previous response must not influence the evidence.

Pass EMISSION_TRACKING-01: Emissions Data Analyst reviewed visual reference

Positive visual checkpoint: 47,340; Boston Hub; not verified emissions evidence. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

16

Pass EMISSION_TRACKING-02: Environmental Compliance Manager

Step 16 of 20

Action
Pass EMISSION_TRACKING-02: Environmental Compliance Manager
Expected resultThe captured Preview evidence records EMISSION_TRACKING-02 with the recorded identifiers BELOW SCREENING THRESHOLD, AT RISK (+340 MT), not a legal compliance determination; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running EMISSION_TRACKING-02. A previous response must not influence the evidence.

Pass EMISSION_TRACKING-02: Environmental Compliance Manager reviewed visual reference

Positive visual checkpoint: BELOW SCREENING THRESHOLD; AT RISK (+340 MT); not a legal compliance determination. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

17

Pass EMISSION_TRACKING-03: Decarbonization Program Lead

Step 17 of 20

Action
Pass EMISSION_TRACKING-03: Decarbonization Program Lead
Expected resultThe captured Preview evidence records EMISSION_TRACKING-03 with the recorded identifiers Boston Hub LDAR, 10 months, engineering, finance, environmental, and executive review; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running EMISSION_TRACKING-03. A previous response must not influence the evidence.

Pass EMISSION_TRACKING-03: Decarbonization Program Lead reviewed visual reference

Positive visual checkpoint: Boston Hub LDAR; engineering, finance, environmental, and executi. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

18

Pass EMISSION_TRACKING-04: Sustainability Lead

Step 18 of 20

Action
Pass EMISSION_TRACKING-04: Sustainability Lead
Expected resultThe captured Preview evidence records EMISSION_TRACKING-04 with the recorded identifiers Appalachian Reforestation, No credit purchase, offset claim; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running EMISSION_TRACKING-04. A previous response must not influence the evidence.

Pass EMISSION_TRACKING-04: Sustainability Lead reviewed visual reference

Positive visual checkpoint: Appalachian Reforestation; No credit purchase; offset claim. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

19

Pass EMISSION_TRACKING-05: Environmental Manager

Step 19 of 20

Action
Pass EMISSION_TRACKING-05: Environmental Manager
Expected resultThe captured Preview evidence records EMISSION_TRACKING-05 with the recorded identifiers Phase 1 (Next 90 days), $810K, 27% emissions reduction; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running EMISSION_TRACKING-05. A previous response must not influence the evidence.

Pass EMISSION_TRACKING-05: Environmental Manager reviewed visual reference

Positive visual checkpoint: Phase 1 (Next 90 days); $810K; 27% emissions reduction. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

20

Confirm Draft and stop before publish

Step 20 of 20

Action
Confirm Draft and stop before publish
Expected resultThe agent remains Draft and no Publish action is taken.
Confirm Draft and stop before publish reviewed visual reference

Positive visual checkpoint: Emissions Tracking Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

Troubleshooting

A screenshot or browserfilm frame is missing

Do not invent, recreate, or substitute an image. Keep the step open until its actual evidence is captured and reviewed. Remove --allow-pending only after all workshop evidence gates are met.

A knowledge file is still processing

Wait for ingestion to finish before Preview. A partial answer is not evidence.

A skill upload fails

Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.

The model differs from Easy mode

Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.

The Preview answer misses an identifier

Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.

Should I publish?

No. Keep the same owned manual agent in Draft. Do not choose Publish as part of this tutorial.