{
  "schema": "aibast-manual-build-evidence/1.0",
  "captured_at": "2026-10-08T00:27:46.460416Z",
  "solution": "@aibast-agents-library/energy-regulatory-reporting",
  "status": "passed",
  "environment": {
    "name": "kodyv8",
    "id": "ee67a404-325c-e726-a18a-886fe708ca0b"
  },
  "manual_agent": {
    "display_name": "Regulatory Reporting Manual",
    "bot_id": "11dddd4b-3665-4c28-bc9f-d951229b12bb",
    "created": true
  },
  "target_model": "Claude Opus 5",
  "model_confirmed": true,
  "manual_components": {
    "global_instructions": {
      "expected": true,
      "confirmed": true
    },
    "web_search_removed": {
      "expected": true,
      "confirmed": true
    },
    "knowledge_files": {
      "expected": 2,
      "confirmed": 2
    },
    "skills": {
      "expected": 6,
      "confirmed": 6
    },
    "tools": {
      "expected": 0,
      "confirmed": 0
    }
  },
  "canonical_preview": [
    {
      "case_id": "ENERGY_REGULATORY_REPORTING-01",
      "prompt": "Which filing is overdue and who owns it?",
      "must_include": [
        "PHMSA Annual Pipeline Safety Report",
        "OVERDUE",
        "Pipeline Operations"
      ],
      "must_not_include": [],
      "expected_screenshot": "18-energy_regulatory_reporting-01.jpg",
      "passed": true
    },
    {
      "case_id": "ENERGY_REGULATORY_REPORTING-02",
      "prompt": "Which report data is incomplete or below quality threshold?",
      "must_include": [
        "Data collection incomplete",
        "Data quality score below threshold",
        "authorized report owner"
      ],
      "must_not_include": [],
      "expected_screenshot": "19-energy_regulatory_reporting-02.jpg",
      "passed": true
    },
    {
      "case_id": "ENERGY_REGULATORY_REPORTING-03",
      "prompt": "Show filing state and confirm you did not transmit anything.",
      "must_include": [
        "PHMSA Annual Pipeline Safety Report",
        "OVERDUE",
        "No regulator filing"
      ],
      "must_not_include": [],
      "expected_screenshot": "20-energy_regulatory_reporting-03.jpg",
      "passed": true
    },
    {
      "case_id": "ENERGY_REGULATORY_REPORTING-04",
      "prompt": "What high-severity reporting evidence is still open?",
      "must_include": [
        "Pipeline mileage discrepancy",
        "HIGH",
        "cannot predict an audit outcome"
      ],
      "must_not_include": [],
      "expected_screenshot": "21-energy_regulatory_reporting-04.jpg",
      "passed": true
    },
    {
      "case_id": "ENERGY_REGULATORY_REPORTING-05",
      "prompt": "I need to prepare our quarterly EPA emissions report. Can you pull the data?",
      "must_include": [
        "14 facilities",
        "8.24M tons",
        "down 7.3%"
      ],
      "must_not_include": [],
      "expected_screenshot": "22-energy_regulatory_reporting-05.jpg",
      "passed": true
    },
    {
      "case_id": "ENERGY_REGULATORY_REPORTING-06",
      "prompt": "Generate the EPA submission file for the quarter and show me any compliance risks.",
      "must_include": [
        "EPA_Q1_Emissions_Report.xml",
        "6 sections incomplete",
        "No regulator filing"
      ],
      "must_not_include": [],
      "expected_screenshot": "23-energy_regulatory_reporting-06.jpg",
      "passed": true
    }
  ],
  "browserfilm": {
    "status": "captured",
    "manifest": "solutions/energy-regulatory-reporting/screenshots/manual/browserfilm.json",
    "gif": "solutions/energy-regulatory-reporting/screenshots/manual/manual-build-walkthrough.gif",
    "contact_sheet": "solutions/energy-regulatory-reporting/screenshots/manual/manual-build-contact-sheet.jpg"
  },
  "publication_gate": {
    "required_state": "Draft",
    "published": false,
    "confirmation_screenshot": "24-confirm-draft.jpg"
  }
}
