{
  "schema": "aibast-manual-build-evidence/1.0",
  "captured_at": "2026-10-08T03:54:55.169634Z",
  "solution": "@aibast-agents-library/engineering-standards-advisor",
  "status": "passed",
  "environment": {
    "name": "kodyv8",
    "id": "ee67a404-325c-e726-a18a-886fe708ca0b"
  },
  "manual_agent": {
    "display_name": "Engineering Standards Manual",
    "bot_id": "66a04d3a-7a20-46a6-b703-ef034c7916db",
    "created": true
  },
  "target_model": "Claude Opus 5",
  "model_confirmed": true,
  "manual_components": {
    "global_instructions": {
      "expected": true,
      "confirmed": true
    },
    "web_search_removed": {
      "expected": true,
      "confirmed": true
    },
    "knowledge_files": {
      "expected": 2,
      "confirmed": 2
    },
    "skills": {
      "expected": 6,
      "confirmed": 6
    },
    "tools": {
      "expected": 0,
      "confirmed": 0
    }
  },
  "canonical_preview": [
    {
      "case_id": "ESA-01",
      "prompt": "What is the minimum clearance for a primary conductor over a public road?",
      "must_include": [
        "6.5 m",
        "QR-210-01",
        "page 14"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "18-esa-01.jpg",
      "passed": true
    },
    {
      "case_id": "ESA-02",
      "prompt": "Can I use a Class 5 pole on a 35-degree corner that carries a 75 kVA transformer?",
      "must_include": [
        "UNVETTED",
        "Class 3",
        "Not authoritative"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "19-esa-02.jpg",
      "passed": true
    },
    {
      "case_id": "ESA-03",
      "prompt": "Send the corner-pole interpretation to a standards engineer to confirm.",
      "must_include": [
        "REV-0318",
        "Not Submitted",
        "Nothing was submitted"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "20-esa-03.jpg",
      "passed": true
    },
    {
      "case_id": "ESA-04",
      "prompt": "What is waiting in my standards review queue?",
      "must_include": [
        "REV-0311",
        "Pending reviews",
        "QR-210-04"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "21-esa-04.jpg",
      "passed": true
    },
    {
      "case_id": "ESA-05",
      "prompt": "Show the overhead clearances quick-reference sheet and anything due for re-vetting.",
      "must_include": [
        "QR-210-04",
        "Re-vetting due",
        "3 vetted and current"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "22-esa-05.jpg",
      "passed": true
    },
    {
      "case_id": "ESA-06",
      "prompt": "Scope the Maple Ridge pole replacement job: risk, effort and the standards that apply.",
      "must_include": [
        "7.4 crew-days",
        "INT-0318",
        "Total risk score"
      ],
      "must_not_include": [
        "I do not have access",
        "I cannot help"
      ],
      "expected_screenshot": "23-esa-06.jpg",
      "passed": true
    }
  ],
  "browserfilm": {
    "status": "captured",
    "manifest": "solutions/engineering-standards-advisor/screenshots/manual/browserfilm.json",
    "gif": "solutions/engineering-standards-advisor/screenshots/manual/manual-build-walkthrough.gif",
    "contact_sheet": "solutions/engineering-standards-advisor/screenshots/manual/manual-build-contact-sheet.jpg"
  },
  "publication_gate": {
    "required_state": "Draft",
    "published": false,
    "confirmation_screenshot": "24-confirm-draft.jpg"
  }
}
