  "schema": "aibast-canonical-transcripts/1.0",
  "captured_at": "2026-10-30T01:11:45.699578+00:00",
  "solution": "@aibast-agents-library/field-permit-to-work",
  "onepager": "60. Field Permit to Work Agent one-pager.pptx",
  "brainstem_version": "0.6.17",
  "loaded_tools_after_capture": [
    "FieldPermitToWorkAgent"
  ],
  "agent_sources": [
    {
      "path": "agents/@aibast-agents-library/energy_stacks/field_permit_to_work_stack/field_permit_to_work_agent.py",
      "sha256": "e4c93d7c9fe4aa97e7b1fdc112ef92fe3e722f6024ac20f18cd6a9a6e2ab6f7e"
    }
  ],
  "case_file": "tests/demo_cases/field-permit-to-work.json",
  "case_file_sha256": "111316fa286d0546bea78d61d708a4986495793b7f1839fa12e6aa47c32498ab",
  "strict_isolation": true,
  "transcripts": [
    {
      "case_id": "PTW-01",
      "persona": "Permit Coordinator",
      "onepager_promise": "Shows every permit waiting today with its stage, risk and blocker",
      "prompt": "Which work permits are waiting for today?",
      "assistant_response": "Three permits are waiting for today (Tue 10 Mar 2026, snapshot 06:30):\n\n| Permit | Site | Work | Start | Stage | Risk | Blocker |\n|---|---|---|---|---|---|---|\n| PTW-4471 | Cedar Hill Substation | Tap-changer maintenance | 11:00 | Authorized person review | High | Live isolation not confirmed |\n| PTW-4472 | Riverside Feeder 7 | Cable joint repair | 10:00 | Supervisor review | Medium | Isolation plan incomplete |\n| PTW-4473 | Hilltop Line 3 | Insulator replacement | 13:00 | Supervisor review | Medium | None |\n\nTwo of the three have blockers that must clear before work starts. PTW-4471 is the highest-risk job and starts first among the high-risk work, so I'd check its isolation first. I can draft its risk assessment or run the isolation check next.",
      "agent_logs": "[FieldPermitToWorkAgent] **Permit Queue: Northwind Energy Networks** (snapshot Tue 10 Mar 2026 06:30)\n\n| Permit | Site | Work | Start | Current stage | Risk | Blocker |\n|---|---|---|---|---|---|---|\n| PTW-4471 | Cedar Hill Substation | Tap-changer maintenance | 11:00 | Authorized person review | High | Live isolation not confirmed |\n| PTW-4472 | Riverside Feeder 7 | Cable joint repair | 10:00 | Supervisor review | Medium | Isolation plan incomplete |\n| PTW-4473 | Hilltop Line 3 | Insulator replacement | 13:00 | Supervisor review | Medium | None |\n\n**Today:** 3 permits, 2 with a blocker before work can start.\n**Recommended next:** PTW-4471 at Cedar Hill is the highest-risk job; draft its risk assessment and check its isolation first.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Permit Snapshot]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "PTW-4471",
        "2 with a blocker",
        "Live isolation not confirmed"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-02",
      "persona": "Permit Coordinator",
      "onepager_promise": "Drafts the risk assessment with hazards, controls, PPE and residual risk",
      "prompt": "Draft the risk assessment for the Cedar Hill transformer job.",
      "assistant_response": "**Risk assessment draft: PTW-4471, Cedar Hill Substation Transformer T2**\n\n**Hazards and controls**\n- **Electric shock or arc flash:** De-energize, lock out and tag, prove dead.\n- **Hot oil contact:** Allow a cooling period, use oil-handling gloves, place a drip tray.\n- **Manual handling of heavy components:** Use a mechanical lift and a two-person carry.\n\n**PPE:** Arc-rated coveralls, insulated gloves, face shield.\n\n**Residual risk: 60 of 100 (High)**\n- Base risk: 45\n- Wet weather: +15\n- Senior authorized crew: 0 (no reduction applied)\n\n**Method steps:** Toolbox talk and sign-in, confirm isolation and prove dead, set barriers and signs, work to method statement, tidy site and clear the permit.\n\nThis is a draft for the authorized person to review and sign. I haven't checked the isolation status. If you want, I can run that check next.",
      "agent_logs": "[FieldPermitToWorkAgent] **Risk Assessment Draft: PTW-4471 Cedar Hill Substation Transformer T2**\n\n| Hazard | Controls |\n|---|---|\n| Electric shock or arc flash | De-energize, lock out and tag, prove dead, arc-rated clothing |\n| Hot oil contact | Cooling period, oil-handling gloves, drip tray |\n| Manual handling of heavy components | Mechanical lift, two-person carry |\n\n**PPE:** Arc-rated coveralls, insulated gloves, face shield\n\n| Residual risk | Value |\n|---|---|\n| Base risk | 45 |\n| Weather (wet) | +15 |\n| Senior authorized crew | -0 |\n| **Residual risk score** | **60 of 100 (High)** |\n\n**Method steps:** toolbox talk and sign-in; confirm isolation and prove dead; barriers and signs; work to method statement; tidy site and clear the permit.\n\nRisk bands: Low below 25, Medium 25-54, High 55 or more. Draft for the authorized person to review and sign.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Hazard Library + Permit Snapshot]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "60 of 100",
        "Arc-rated coveralls",
        "Draft for the authorized person"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-03",
      "persona": "Authorized Person",
      "onepager_promise": "Checks the isolation plan against required points and the live switching state",
      "prompt": "Is the isolation for the Cedar Hill job actually in place?",
      "assistant_response": "No, the isolation for the Cedar Hill job (PTW-4471) is not confirmed, so work must not start.\n\nThe plan lists four isolation points, and all four are in the plan. The live switching state shows a gap:\n\n- **CB-CH-02** (circuit breaker) is open but has **no lockout applied**.\n- CB-CH-01 (open, locked), DS-CH-01 (open, locked), and ES-CH-01 (earth switch closed, locked) are correct.\n\nNext step: ask the control room to apply the lockout on CB-CH-02, then re-run the isolation check before the crew briefing. I didn't operate or lock any device.",
      "agent_logs": "[FieldPermitToWorkAgent] **Isolation Check: PTW-4471 Cedar Hill Substation** (live state as of Tue 10 Mar 2026 06:30)\n\n**Plan vs required points: PASS (4 of 4)**\n\n| Point | Type | Required state | Plan |\n|---|---|---|---|\n| ISO-T2-A | Primary disconnector | Open | In plan |\n| ISO-T2-B | Earth switch | Closed | In plan |\n| ISO-T2-C | Lockout padlock | Applied | In plan |\n| ISO-T2-D | Voltage proving point | Tested | In plan |\n\n**Live switching state:**\n\n| Device | Type | State | Lockout |\n|---|---|---|---|\n| CB-CH-01 | Circuit breaker | Open | Applied |\n| CB-CH-02 | Circuit breaker | Open | Not applied |\n| DS-CH-01 | Disconnector | Open | Applied |\n| ES-CH-01 | Earth switch | Closed | Applied |\n\n**Result: Isolation NOT confirmed. Do not start work.** CB-CH-02 lockout not applied. Ask the control room to correct it and re-check before the crew briefing.\n\nNo device was operated or locked.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Isolation Plan + Control Room Snapshot]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "CB-CH-02 lockout not applied",
        "Do not start work",
        "No device was operated"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-04",
      "persona": "Permit Coordinator",
      "onepager_promise": "Tracks sign-offs and timing so permits are ready for the planned start",
      "prompt": "Where is the Cedar Hill permit in the sign-off chain, and will it be ready for the 11:00 start?",
      "assistant_response": "PTW-4471 (Cedar Hill Substation) is at the **first sign-off stage**, with **Lee Carter, authorized person,** reviewing it. It's a P1 (high-risk) permit.\n\nThe route is:\n1. **Authorized person review** (Lee Carter): due by 08:30\n2. **Site manager endorsement**: due by 10:00\n3. **Permit office issue**: due by 10:30\n\nOn the current targets, it will be **ready 30 minutes before the 11:00 start**, with 10:30 as the earliest issue time.\n\nThe schedule has one condition: the permit can only be issued once the live isolation is confirmed. I can run an isolation check to see where that stands.",
      "agent_logs": "[FieldPermitToWorkAgent] **Sign-off Route: PTW-4471 Cedar Hill Substation** (from Tue 10 Mar 2026 06:30)\n\n| Stage | Accountable | Target time | Due by |\n|---|---|---|---|\n| Authorized person review | Lee Carter, authorized person | 120 min | 08:30 |\n| Site manager endorsement | Site manager | 90 min | 10:00 |\n| Permit office issue | Permit office | 30 min | 10:30 |\n\n**Next sign-off:** Lee Carter, authorized person (Authorized person review), priority P1 (High risk).\n**Earliest issue:** 10:30. On track: ready 30 minutes before the 11:00 start.\n**Condition:** the permit can only be issued once the live isolation is confirmed.\n\nRouting note prepared for the permit office; no sign-off was given or requested.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Permit Workflow]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "Lee Carter",
        "Earliest issue",
        "10:30"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-05",
      "persona": "Crew Lead",
      "onepager_promise": "Confirms every crew member has acknowledged the briefing before work starts",
      "prompt": "Has the Cedar Hill crew acknowledged the briefing?",
      "assistant_response": "Not fully. For the Cedar Hill transformer job (PTW-4471, crew CR-12), 3 of 4 have acknowledged the briefing:\n\n- Morgan Hayes (crew lead): Acknowledged\n- Ravi Kumar (electrician): Acknowledged\n- Elena Novak (electrician): Acknowledged\n- Chris Dale (apprentice): **Not yet**\n\nWork cannot start until Chris Dale acknowledges. I haven't messaged anyone, so the crew lead will need to make sure Chris completes the briefing.",
      "agent_logs": "[FieldPermitToWorkAgent] **Crew Briefing: PTW-4471 crew CR-12**\n\n**Briefing topics:** isolation points and lockouts, PPE check, emergency contacts and muster point, site hazards (Electric shock or arc flash, Hot oil contact, Manual handling of heavy components).\n\n| Crew member | Role | Acknowledgement |\n|---|---|---|\n| Morgan Hayes | Crew lead | Acknowledged |\n| Ravi Kumar | Electrician | Acknowledged |\n| Elena Novak | Electrician | Acknowledged |\n| Chris Dale | Apprentice | Not yet |\n\n**Status:** Incomplete: 3 of 4 acknowledged. Work cannot start until Chris Dale acknowledges.\n\nBriefing sheet prepared for the crew lead; no one was messaged.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Crew Briefing Records]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "3 of 4 acknowledged",
        "Chris Dale",
        "no one was messaged"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-06",
      "persona": "Authorized Person",
      "onepager_promise": "Reconciles people, tools and site status before a permit is cleared",
      "prompt": "The Cedar Hill crew has finished. Can we close the permit?",
      "assistant_response": "**No, not yet.** PTW-4471 (Cedar Hill Substation) is on hold for review and has not been closed.\n\nThe work is complete and the area is reported safe, but the tool count doesn't reconcile: 18 tools were issued and 17 were returned, so one is unaccounted for.\n\n**Next steps:**\n- The crew lead needs to find the missing tool.\n- Once it's resolved, an authorized person can clear the permit, and the control room can restore supply.\n\nOnce the crew lead confirms the tool is found, I can re-run the clearance check.",
      "agent_logs": "[FieldPermitToWorkAgent] **Permit Clearance Check: PTW-4471 Cedar Hill Substation**\n\n| Check | Start | Close |\n|---|---|---|\n| People on site | 4 | 4 |\n| Tools | 18 issued | 17 returned |\n| Area safe | | Yes |\n| Work complete | | Yes |\n\n**Close-out entered:** 16:40 by Morgan Hayes\n**Clearance status:** Held for review\n\n**Issues:**\n- Tools: 18 issued, 17 returned (1 unaccounted for)\n\n**Next step:** the crew lead resolves each issue (for a tool shortfall, finds the missing tool) before the authorized person clears the permit and the control room restores supply.\n\nThe permit was not closed.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Close-out Records]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "Held for review",
        "1 unaccounted for",
        "The permit was not closed"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-07",
      "persona": "Operations Manager",
      "onepager_promise": "Rolls up permit safety performance and the hazards that matter most",
      "prompt": "How are we doing on permit safety this month?",
      "assistant_response": "**Permit safety, last 30 days (to 10 Mar 2026):**\n\n- **Permits issued:** 212\n- **Closed on time:** 196 (92%)\n- **Near misses reported:** 5\n- **Lockout gaps caught before work:** 7\n- **Isolation plans returned to planner:** 4\n- **Average permit cycle:** 18.4 hours\n\n**Top hazards:** electric shock or arc flash, working at height, striking a live cable while digging, and confined space.\n\nThe main pre-start finding is lockout gaps, so the live isolation check before each crew briefing is the key control to keep up.",
      "agent_logs": "[FieldPermitToWorkAgent] **Permit Safety Roll-up: Northwind Energy Networks** (30 days to Tue 10 Mar 2026)\n\n| Measure | Value |\n|---|---|\n| Permits issued | 212 |\n| Closed on time | 196 (92%) |\n| Near misses reported | 5 |\n| Average permit cycle | 18.4 hours |\n| Lockout gaps caught before work | 7 |\n| Isolation plans returned to planner | 4 |\n\n**Top hazards this month:**\n1. Electric shock or arc flash\n2. Working at height\n3. Striking a live cable while digging\n4. Confined space\n\n**Focus:** lockout gaps are the most frequent pre-start finding; keep the live isolation check before every crew briefing.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Permit Analytics Snapshot]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "212",
        "Lockout gaps caught before work",
        "Near misses"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-08",
      "persona": "Crew Lead",
      "onepager_promise": "Checks a new work request for missing isolation points, competencies and method before a permit is raised",
      "prompt": "Is the Hilltop pole replacement request ready to raise a permit?",
      "assistant_response": "No, WR-9083 (Hilltop pole replacement, raised by Priya Raman, crew lead CR-21, planned Thu 12 Mar 2026 08:00) is not ready to raise a permit. Two of six required fields are missing:\n\n- **Isolation points:** none listed for this overhead line job.\n- **Crew competencies:** not listed for Priya Raman, Leo Grant, or Nina Holt.\n\nThe other four fields (work type, location, asset, method statement MS-OH-04) are complete.\n\nI haven't returned the request or raised a permit. The permit coordinator makes that decision, so the gaps would need to go back to Priya Raman.",
      "agent_logs": "[FieldPermitToWorkAgent] **Work Request Check: WR-9083** (raised by Priya Raman, crew lead CR-21, planned Thu 12 Mar 2026 08:00)\n\n| Required field | Entered | Check |\n|---|---|---|\n| Work type | Pole replacement | Complete |\n| Location | Hilltop Line 3, pole 3-22 | Complete |\n| Asset | Pole 3-22 and stay | Complete |\n| Isolation points | (blank) | MISSING: No isolation points listed for an overhead line job |\n| Crew and competencies | Priya Raman, Leo Grant, Nina Holt (competencies not listed) | MISSING: Competencies not listed for any crew member |\n| Method statement | MS-OH-04 Pole replacement | Complete |\n\n**Result: Not ready to raise a permit.** 2 of 6 required fields need work. Return it to Priya Raman, crew lead CR-21 with the gaps above.\n\nNo permit was raised and the request was not returned; the permit coordinator decides.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Work Requests]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "WR-9083",
        "Not ready to raise a permit",
        "No isolation points listed"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-09",
      "persona": "Permit Coordinator",
      "onepager_promise": "Shows the control room isolation confirmation and drafts the permit update and crew notice",
      "prompt": "Has the control room confirmed the isolation for the Hilltop Line 3 job? Draft the crew notice.",
      "assistant_response": "**Yes, the control room has confirmed isolation for PTW-4473 (Hilltop Line 3).** Sam Ortiz, control engineer, confirmed at 06:20 under switching log DMS-SW-55102:\n\n- RC-HT-03 recloser: open and locked\n- DS-HT-03 disconnector: open and locked\n\nThe live switching state matches the plan. Before the crew relies on this, though, check one gap: the plan also requires portable earths applied (ISO-L3-B), and the live snapshot doesn't list them. Confirm the earths are on site before acceptance.\n\n**Draft crew notice (CR-21: Priya Raman, Leo Grant, Nina Holt):**\n\n> The isolation for PTW-4473 Hilltop Line 3, Span 3-14 to 3-15, is confirmed by the control room (DMS-SW-55102). Do not start until your crew lead has accepted the permit on site and the safety brief is done.\n\nNothing has been sent and the permit status hasn't changed. The permit coordinator needs to send the notice and update the status to \"isolation confirmed, ready for crew acceptance at the 13:00 start, once sign-offs are complete.\"",
      "agent_logs": "[FieldPermitToWorkAgent] **Isolation Check: PTW-4473 Hilltop Line 3** (live state as of Tue 10 Mar 2026 06:30)\n\n**Plan vs required points: PASS (3 of 3)**\n\n| Point | Type | Required state | Plan |\n|---|---|---|---|\n| ISO-L3-A | Line recloser | Open | In plan |\n| ISO-L3-B | Portable earths | Applied | In plan |\n| ISO-L3-C | Lockout padlock | Applied | In plan |\n\n**Live switching state:**\n\n| Device | Type | State | Lockout |\n|---|---|---|---|\n| RC-HT-03 | Recloser | Open | Applied |\n| DS-HT-03 | Disconnector | Open | Applied |\n\n**Result: Isolation confirmed** against the plan and the live switching state.\n\nNo device was operated or locked.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Isolation Plan + Control Room Snapshot]\nAgents: FieldPermitToWorkAgent\n[FieldPermitToWorkAgent] **Isolation Confirmation: PTW-4473 Hilltop Line 3**\n\n**Status: Confirmed by the control room.** Sam Ortiz, control engineer at 06:20, switching log DMS-SW-55102.\n\n- RC-HT-03 recloser open and locked\n- DS-HT-03 disconnector open and locked\n\n**Draft permit status update:** Isolation confirmed (DMS-SW-55102); ready for crew acceptance at the 13:00 start once sign-offs are complete.\n\n**Draft crew notification (crew CR-21: Priya Raman, Leo Grant, Nina Holt):** \"The isolation for PTW-4473 Hilltop Line 3 Span 3-14 to 3-15 is confirmed by the control room (DMS-SW-55102). Do not start until your crew lead has accepted the permit on site and the safety brief is done.\"\n\nDrafts for the permit coordinator to send; the permit status was not changed and no one was notified.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Control Room Confirmations]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "Sam Ortiz",
        "DMS-SW-55102",
        "Draft crew notification"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-10",
      "persona": "Crew Lead",
      "onepager_promise": "Confirms isolation, sign-offs and the briefing are all in place before the crew lead accepts on site",
      "prompt": "Can my crew accept the Cedar Hill permit on site yet?",
      "assistant_response": "No, not yet. Morgan Hayes can't accept PTW-4471 (Cedar Hill Substation) on site until these are done:\n\n- **Isolation:** the control room hasn't confirmed it.\n- **Permit issue:** the sign-offs aren't complete, so the permit hasn't been issued.\n- **Safety brief:** Chris Dale, the apprentice, hasn't acknowledged it. Morgan, Ravi and Elena have.\n\nOnce all three are met, Morgan accepts on the mobile app and logs the full crew (CR-12) on the live work. Nothing was accepted or sent to the crew.",
      "agent_logs": "[FieldPermitToWorkAgent] **Permit Acceptance Readiness: PTW-4471 Cedar Hill Substation** (crew lead Morgan Hayes)\n\n| Before the crew lead accepts | Met |\n|---|---|\n| Isolation confirmed by the control room | No |\n| All sign-offs complete (permit issued) | No |\n| Safety brief acknowledged by every crew member | No |\n\n**Crew log to record on acceptance (crew CR-12):**\n\n| Crew member | Role | Briefing |\n|---|---|---|\n| Morgan Hayes | Crew lead | Acknowledged |\n| Ravi Kumar | Electrician | Acknowledged |\n| Elena Novak | Electrician | Acknowledged |\n| Chris Dale | Apprentice | Not yet |\n\n**Result:** Not ready to accept. Outstanding: Isolation confirmed by the control room; All sign-offs complete (permit issued); Safety brief not acknowledged by Chris Dale. Morgan Hayes accepts on the mobile app only when every item is met, then logs every crew member on the live work.\n\nThe permit was not accepted and no one was messaged.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Permit Snapshot + Crew Briefing Records]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "Not ready to accept",
        "Chris Dale",
        "Isolation confirmed by the control room"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    },
    {
      "case_id": "PTW-11",
      "persona": "Safety Auditor",
      "onepager_promise": "Rebuilds the signed chain of custody for an archived permit and flags any missing signature",
      "prompt": "Pull the audit trail for the archived Riverside link box permit. Is anything missing?",
      "assistant_response": "Yes. The Riverside link box permit is **PTW-4462** (Riverside Feeder 7, record PR-2026-0314). Its chain of custody is incomplete.\n\n**Missing:** Step 7, \"Permit cleared\" (Mon 9 Mar, 14:10), has no signature. The archive shows the permit was cleared and archived without a named person signing off on the clearance.\n\nEverything else is signed and time-stamped: work request (Jordan Wells), risk assessment (Dana Brooks), isolation validated (Lee Carter), sign-offs (permit office), control room isolation confirmation (Sam Ortiz), crew acceptance (Jordan Wells), and archiving (permit office).\n\nThe audit tool recommends flagging this to the permit office for correction and including it in the monthly assurance review. I can't change the record myself.\n\nI also pulled PTW-4459, the other archived permit, which is the Cedar Hill Substation busbar inspection. Its chain is complete.",
      "agent_logs": "[FieldPermitToWorkAgent] **Permit Audit Trail: PTW-4459 Cedar Hill Substation** (Busbar inspection; record PR-2026-0311)\n\n| Step | Event | Time | Signed by |\n|---|---|---|---|\n| 1 | Work request | Mon 9 Mar 07:10 | Morgan Hayes |\n| 2 | Risk assessment | Mon 9 Mar 07:40 | Dana Brooks |\n| 3 | Isolation validated | Mon 9 Mar 08:05 | Lee Carter |\n| 4 | Sign-offs complete | Mon 9 Mar 09:20 | Permit office |\n| 5 | Isolation confirmed by control room | Mon 9 Mar 09:35 | Sam Ortiz |\n| 6 | Crew accepted permit | Mon 9 Mar 09:50 | Morgan Hayes |\n| 7 | Permit cleared | Mon 9 Mar 15:30 | Lee Carter |\n| 8 | Archived | Mon 9 Mar 15:45 | Permit office |\n\n**Chain of custody: Complete.** Every step from request to archive is signed and time-stamped.\n\nRead-only view of the archived record; nothing was changed.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Permit Records Library]\nAgents: FieldPermitToWorkAgent\n[FieldPermitToWorkAgent] **Permit Audit Trail: PTW-4462 Riverside Feeder 7** (Link box inspection; record PR-2026-0314)\n\n| Step | Event | Time | Signed by |\n|---|---|---|---|\n| 1 | Work request | Mon 9 Mar 08:00 | Jordan Wells |\n| 2 | Risk assessment | Mon 9 Mar 08:25 | Dana Brooks |\n| 3 | Isolation validated | Mon 9 Mar 08:50 | Lee Carter |\n| 4 | Sign-offs complete | Mon 9 Mar 10:05 | Permit office |\n| 5 | Isolation confirmed by control room | Mon 9 Mar 10:15 | Sam Ortiz |\n| 6 | Crew accepted permit | Mon 9 Mar 10:30 | Jordan Wells |\n| 7 | Permit cleared | Mon 9 Mar 14:10 | MISSING signature |\n| 8 | Archived | Mon 9 Mar 14:20 | Permit office |\n\n**Chain of custody: Incomplete.** Permit cleared has no signature; flag it to the permit office for correction and include it in the monthly assurance review.\n\nRead-only view of the archived record; nothing was changed.\n\nSynthetic permit support only. This agent prepares drafts and checks; it does not issue, approve or close a permit, operate or lock any device, instruct a crew, or authorize work. Authorized people make every safety decision.\n\nSource: [Synthetic Permit Records Library]\nAgents: FieldPermitToWorkAgent",
      "expected_agent": "FieldPermitToWorkAgent",
      "must_include": [
        "PTW-4462",
        "Permit cleared",
        "MISSING"
      ],
      "model": "claude-haiku-5.5",
      "requested_model": "claude-haiku-5.5",
      "passed": true
    }
  ]
}