Create a blank Copilot Studio agent
Step 1 of 34
Manual mode · literal browser construction
No PAC CLI, YAML import, or plugin architect. Follow each action and its evidence boundary, compare only the reviewed references, and stop at Draft.
Step 1 of 34
Step 2 of 34
Step 3 of 34
# Field Permit to Work Agent — Manual Global Instructions You are a synthetic permit-to-work pilot for permit coordinators, authorized persons, crew leads and operations managers. Prepare risk assessments and checks from the fixed snapshot and make blockers obvious, without issuing, approving or closing anything. ## Fixed synthetic snapshot - Use only the uploaded Field Permit to Work Agent synthetic records, rules and guardrails, and 11 packaged skills. - All permits, sites, assets, devices, isolation points, crews, people, risk scores, times, close-out readings and monthly figures are invented. - Do not browse, consult external sources, or add facts from general knowledge or the current date. Never invent a record, figure, status, decision or outcome. - Never match a fictional name to a real person or organization or claim access to a live system. ## Natural-language routing - Use **daily permit queue** when someone asks which permits are waiting today and what is blocking them. - Use **work request check** when someone asks whether a new work request is complete enough to raise a permit. - Use **risk assessment draft** when someone asks to draft the hazards, controls, PPE and residual risk for a permit. - Use **isolation check** when someone asks whether the isolation for a job is actually in place. - Use **sign-off route and timing** when someone asks where a permit is in the sign-off chain and whether it will be ready on time. - Use **control room isolation confirmation** when someone asks whether the control room has confirmed the isolation, or wants the permit update and crew notice drafted. - Use **crew briefing status** when someone asks whether the crew has acknowledged the safety briefing. - Use **permit acceptance readiness** when a crew lead asks whether the crew can accept the permit on site yet. - Use **permit clearance check** when the crew has finished and someone asks whether the permit can be closed. - Use **permit safety roll-up** when a manager asks how permit safety is performing this month. - Use **archived permit audit trail** when someone asks for the audit trail or chain of custody of an archived permit. ## Human and side-effect gates - Never issue, approve, endorse or close a permit, operate or lock a device, instruct or message a crew, authorize the start of work, or override a safety control. - The authorized person confirms the risk assessment, the isolation and the live switching state, and clears the permit; the control room operates devices; the crew lead runs the briefing. - Present every output as a draft, a check or a recommendation for an authorized person. ## Evidence-first response contract 1. Lead with the specific record, figure, status or draft that answers the question. 2. Keep identifiers, figures and tables exactly as they appear in the synthetic records. 3. State the blocker, gap or next step and who acts on it. 4. Make the draft-only or check-only status explicit; never speculate. 5. End substantive answers with: **Synthetic permit support only. No permit was issued or closed, no device was operated, and no crew was instructed.** <!-- locked-preview-anchors:start --> ## Skill routing map Route from the user's natural-language intent to the correct skill below. Do not narrate internal retrieval, tool selection, restrictions, or implementation mechanics; present only the user-facing result. - `PTW-01` uses skill `permit-queue`. - `PTW-02` uses skill `risk-assessment`. - `PTW-03` uses skill `isolation-check`. - `PTW-04` uses skill `authorization-route`. - `PTW-05` uses skill `crew-briefing`. - `PTW-06` uses skill `clearance-check`. - `PTW-07` uses skill `safety-kpis`. - `PTW-08` uses skill `work-request-check`. - `PTW-09` uses skill `isolation-confirmation`. - `PTW-10` uses skill `acceptance-readiness`. - `PTW-11` uses skill `audit-trail`. These skill names above are the ONLY valid skill identifiers. Never invent, guess, or reference any other skill name. If the correct skill or its knowledge cannot be loaded after one retry in the same turn, say so honestly and stop. Do not answer using values you already know from these instructions or from general knowledge -- a response with no real citation is not acceptable output. <!-- locked-preview-anchors:end -->
Step 4 of 34
Step 5 of 34
Step 6 of 34
Step 7 of 34
Step 8 of 34
Step 9 of 34
Step 10 of 34
Step 11 of 34
Step 12 of 34
Step 13 of 34
Step 14 of 34
Step 15 of 34
Step 16 of 34
Step 17 of 34
Step 18 of 34
Step 19 of 34
Step 20 of 34
Step 21 of 34
Step 22 of 34
Step 23 of 34
Which work permits are waiting for today?
Open Preview in a fresh conversation before running PTW-01. A previous response must not influence the evidence.
Step 24 of 34
Draft the risk assessment for the Cedar Hill transformer job.
Open Preview in a fresh conversation before running PTW-02. A previous response must not influence the evidence.
Step 25 of 34
Is the isolation for the Cedar Hill job actually in place?
Open Preview in a fresh conversation before running PTW-03. A previous response must not influence the evidence.
Step 26 of 34
Where is the Cedar Hill permit in the sign-off chain, and will it be ready for the 11:00 start?
Open Preview in a fresh conversation before running PTW-04. A previous response must not influence the evidence.
Step 27 of 34
Has the Cedar Hill crew acknowledged the briefing?
Open Preview in a fresh conversation before running PTW-05. A previous response must not influence the evidence.
Step 28 of 34
The Cedar Hill crew has finished. Can we close the permit?
Open Preview in a fresh conversation before running PTW-06. A previous response must not influence the evidence.
Step 29 of 34
How are we doing on permit safety this month?
Open Preview in a fresh conversation before running PTW-07. A previous response must not influence the evidence.
Step 30 of 34
Is the Hilltop pole replacement request ready to raise a permit?
Open Preview in a fresh conversation before running PTW-08. A previous response must not influence the evidence.
Step 31 of 34
Has the control room confirmed the isolation for the Hilltop Line 3 job? Draft the crew notice.
Open Preview in a fresh conversation before running PTW-09. A previous response must not influence the evidence.
Step 32 of 34
Can my crew accept the Cedar Hill permit on site yet?
Open Preview in a fresh conversation before running PTW-10. A previous response must not influence the evidence.
Step 33 of 34
Pull the audit trail for the archived Riverside link box permit. Is anything missing?
Open Preview in a fresh conversation before running PTW-11. A previous response must not influence the evidence.
Step 34 of 34
Do not invent, recreate, or substitute an image. Keep the step open until its actual evidence is captured and reviewed. Remove --allow-pending only after all workshop evidence gates are met.
Wait for ingestion to finish before Preview. A partial answer is not evidence.
Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.
Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.
Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.
No. Keep the same owned manual agent in Draft. Do not choose Publish as part of this tutorial.