AAIBAST evidence report
Academy / Predictive Asset Maintenance Intelligence Agent
Back to workshop

Workshop evidence

Predictive Asset Maintenance Intelligence Agent

This report separates source-only checks, native final-answer acceptance and learner-facing visual evidence. A screenshot supports only its reviewed visible scope; it does not certify every workshop step.

24Reusable positive checkpoints
0Open or historical checkpoints excluded from current proof
0Optional future Learn-step captures

Deterministic case contract

These source-only marker checks are not, by themselves, native final-answer passes.

CaseMust includeMust not claim
GAM-01 Grid Asset Risk RankingTX-0417SG-1123 I do not have accessI cannot help
GAM-02 Preventive Work Order DraftTap changer contact kitSubstation Crew B I do not have accessI cannot help
GAM-03 Asset Register Update CheckWO-55097Insulation resistance I do not have accessI cannot help
GAM-04 Fleet Health and Replacement PlanTX-0417$11,340,000 I do not have accessI cannot help

Displayed visual checkpoints

Only reviewed checkpoints count within their stated scope. A labeled PNG board can combine multiple actual views; it is not an old JPEG or a continuous walkthrough. Asset paths are included for traceability.

CheckpointModeVisible evidenceAnnotated asset
easy-review-build easy Predictive Asset Maintenance; replacement-plan; register-update; work-order-draft; risk-ranking; aibast_grid-asset-maintenance-synthetic-records.; aibast_grid-asset-maintenance-rules-and-guardrai solutions/grid-asset-maintenance/screenshots/assisted/annotated/01-review-build.png
easy-gam-01 easy Grid Asset Risk Ranking; TX-0417; SG-1123 solutions/grid-asset-maintenance/screenshots/assisted/annotated/02-gam-01.png
easy-gam-02 easy Preventive Work Order Draft; Substation Crew B; Tap changer contact kit solutions/grid-asset-maintenance/screenshots/assisted/annotated/03-gam-02.png
easy-gam-03 easy Asset Register Update Check; WO-55097; Insulation resistance solutions/grid-asset-maintenance/screenshots/assisted/annotated/04-gam-03.png
easy-gam-04 easy Fleet Health and Replacement Plan; $11,340,000; TX-0417 solutions/grid-asset-maintenance/screenshots/assisted/annotated/05-gam-04.png
easy-confirm-draft easy Predictive Asset Maintenance solutions/grid-asset-maintenance/screenshots/assisted/annotated/06-confirm-draft.png
hard-step-01 hard Untitled Agent solutions/grid-asset-maintenance/screenshots/manual/annotated/01-create-blank-agent.png
hard-step-02 hard Predictive Asset Manual solutions/grid-asset-maintenance/screenshots/manual/annotated/02-name-agent.png
hard-step-03 hard Predictive Asset Maintenance Intelligence — Manual Global Instructions solutions/grid-asset-maintenance/screenshots/manual/annotated/03-enter-instructions.png
hard-step-04 hard Your agent has been saved; Draft solutions/grid-asset-maintenance/screenshots/manual/annotated/04-save-instructions.png
hard-step-05 hard Provide trusted context to guide decisions solutions/grid-asset-maintenance/screenshots/manual/annotated/05-remove-web-search.png
hard-step-06 hard aibast_grid-asset-maintenance-rules-and-guardrails.md solutions/grid-asset-maintenance/screenshots/manual/annotated/06-add-aibast-grid-asset-maintenance-rules-and-guardrails.png
hard-step-07 hard aibast_grid-asset-maintenance-synthetic-records.md solutions/grid-asset-maintenance/screenshots/manual/annotated/07-add-aibast-grid-asset-maintenance-synthetic-records.png
hard-step-08 hard register-update solutions/grid-asset-maintenance/screenshots/manual/annotated/08-add-aibast-register-update-03.png
hard-step-09 hard replacement-plan solutions/grid-asset-maintenance/screenshots/manual/annotated/09-add-aibast-replacement-plan-04.png
hard-step-10 hard risk-ranking solutions/grid-asset-maintenance/screenshots/manual/annotated/10-add-aibast-risk-ranking-01.png
hard-step-11 hard work-order-draft solutions/grid-asset-maintenance/screenshots/manual/annotated/11-add-aibast-work-order-draft-02.png
hard-step-12 hard Model Claude Opus 5.5; work-order-draft; risk-ranking; replacement-plan; register-update; aibast_grid-asset-maintenance-synthetic-records.md; aibast_grid-asset-maintenance-rules-and-guardrails.md solutions/grid-asset-maintenance/screenshots/manual/annotated/12-review-inventory.png
hard-step-13 hard Predictive Asset Manual; New chat solutions/grid-asset-maintenance/screenshots/manual/annotated/13-open-preview.png
hard-gam-01 hard Grid Asset Risk Ranking; TX-0417; SG-1123 solutions/grid-asset-maintenance/screenshots/manual/annotated/14-gam-01.png
hard-gam-02 hard Preventive Work Order Draft; Substation Crew B; Tap changer contact kit solutions/grid-asset-maintenance/screenshots/manual/annotated/15-gam-02.png
hard-gam-03 hard WO-55097; Asset Register Update Check; Insulation resistance solutions/grid-asset-maintenance/screenshots/manual/annotated/16-gam-03.png
hard-gam-04 hard Fleet Health and Replacement Plan; $11,340,000; TX-0417 solutions/grid-asset-maintenance/screenshots/manual/annotated/17-gam-04.png
hard-step-18 hard Predictive Asset Manual solutions/grid-asset-maintenance/screenshots/manual/annotated/18-confirm-draft.png

Reference-only visual gaps

These checkpoints remain open or reference historical captures. No current image is implied by this table; review and reshoot requirements must be resolved before acceptance.

CheckpointModeSource assetReason

Downloads for audit

Download source-only transcripts Download visual checkpoint contract Download export manifest Download portable bundle Download Copilot Studio solutionDeployment settingsExport details