name: work-order-draft
description: "Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised."
---
# Work order draft

Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised.

## Procedure

1. Use only the uploaded synthetic records and rules.
2. Lead with the specific evidence that answers the persona's question.
3. Keep the figures, identifiers, and tables exactly as recorded for case `GAM-02`.
4. Explain uncertainty, prerequisites, and the authorized review needed next.
5. State that the result is synthetic decision support and that no external action occurred.

## Deterministic pilot evidence

- `Preventive Work Order Draft`
- `Tap changer contact kit`
- `Substation Crew B`

## Safety gate

Do not claim to have raised, approved, or scheduled a work order, ordered or reserved a part, assigned a crew, planned switching, changed the asset register or fixed asset register, or committed capital. Stop at a reviewable draft for the authorized engineer to approve.