AAIBAST manual workshop
Academy / Live Event Launch Planner Agent
Watch the manual film Back to workshopDownload source bundle

Manual mode · literal browser construction

Build Live Event Launch Planner Agent manually.

No PAC CLI, YAML import, or plugin architect. Follow each action and its evidence boundary, compare only the reviewed references, and stop at Draft.

Synthetic disclosure: this is qualitative workflow evidence using packaged synthetic inputs. It is not a customer KPI or a live-system result.

Build and verify

1

Create a blank Copilot Studio agent

Step 1 of 18

Action
Create a blank Copilot Studio agent
Expected resultA blank Copilot Studio agent is visible in the captured Draft workspace.
Create a blank Copilot Studio agent reviewed visual reference

Positive visual checkpoint: Untitled Agent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

2

Name Live Event Launch Manual

Step 2 of 18

Action
Name Live Event Launch Manual
Expected resultThe page header shows the recorded manual build name: Live Event Launch Manual.
Name Live Event Launch Manual reviewed visual reference

Positive visual checkpoint: Live Event Launch Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

3

Enter the reviewed global instructions

Step 3 of 18

Action
Enter the reviewed global instructions
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Enter the reviewed global instructions reviewed visual reference

Positive visual checkpoint: Live Event Launch Planner — Manual Global Instru. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

4

Save the instruction policy

Step 4 of 18

Action
Save the instruction policy
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Save the instruction policy reviewed visual reference

Positive visual checkpoint: Draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

5

Remove default web search

Step 5 of 18

Action
Remove default web search
Expected resultThe captured inventory no longer lists the default web-search capability.
Remove default web search reviewed visual reference

Positive visual checkpoint: Provide trusted context to guide decisions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

6

Add knowledge: aibast_live-event-launch-planner-rules-and-guardrails.md

Step 6 of 18

Action
Add knowledge: aibast_live-event-launch-planner-rules-and-guardrails.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: aibast_live-event-launch-planner-rules-and-guardrails.md reviewed visual reference

Positive visual checkpoint: aibast_live-event-launch-planner-rules-and-guard. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

7

Add knowledge: aibast_live-event-launch-planner-synthetic-records.md

Step 7 of 18

Action
Add knowledge: aibast_live-event-launch-planner-synthetic-records.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: aibast_live-event-launch-planner-synthetic-records.md reviewed visual reference

Positive visual checkpoint: aibast_live-event-launch-planner-synthetic-recor. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

8

Add skill: aibast_announcement-check_03

Step 8 of 18

Action
Add skill: aibast_announcement-check_03
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_announcement-check_03 reviewed visual reference

Positive visual checkpoint: announcement-check. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

9

Add skill: aibast_launch-summary_04

Step 9 of 18

Action
Add skill: aibast_launch-summary_04
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_launch-summary_04 reviewed visual reference

Positive visual checkpoint: launch-summary. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

10

Add skill: aibast_launch-timeline_01

Step 10 of 18

Action
Add skill: aibast_launch-timeline_01
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_launch-timeline_01 reviewed visual reference

Positive visual checkpoint: launch-timeline. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

11

Add skill: aibast_readiness-checklist_02

Step 11 of 18

Action
Add skill: aibast_readiness-checklist_02
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_readiness-checklist_02 reviewed visual reference

Positive visual checkpoint: readiness-checklist. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

12

Review model, skills, knowledge, and safety boundaries

Step 12 of 18

Action
Review model, skills, knowledge, and safety boundaries
Expected resultThe screenshot visibly confirms Claude Opus 5.5, 4 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Review model, skills, knowledge, and safety boundaries reviewed visual reference

Positive visual checkpoint: Claude Opus 5.5; readiness-checklist; launch-timeline; launch-summary; announcement-check; aibast_live-event-launch-planner-synthetic-recor; aibast_live-event-launch-planner-rules-and-guard. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

13

Open a fresh Preview conversation

Step 13 of 18

Action
Open a fresh Preview conversation
Expected resultA fresh Preview surface or its recorded qualitative result is visible; only the evidence file defines a pass.
Open a fresh Preview conversation reviewed visual reference

Positive visual checkpoint: Live Event Launch Manual; New chat. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

14

Pass LEL-01: Live Operations Manager

Step 14 of 18

Action
Pass LEL-01: Live Operations Manager
Expected resultThe captured Preview evidence records LEL-01 with the recorded identifiers Launch Timeline, Launch communications approval, In 12 days; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running LEL-01. A previous response must not influence the evidence.

Pass LEL-01: Live Operations Manager reviewed visual reference

Positive visual checkpoint: Launch Timeline; Launch communications approval; In 12 days. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

15

Pass LEL-02: Live Operations Manager

Step 15 of 18

Action
Pass LEL-02: Live Operations Manager
Expected resultThe captured Preview evidence records LEL-02 with the recorded identifiers Readiness Checklist, Mateo Silva, 1 of 4; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running LEL-02. A previous response must not influence the evidence.

Pass LEL-02: Live Operations Manager reviewed visual reference

Positive visual checkpoint: Readiness Checklist; 1 of 4; Mateo Silva. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

16

Pass LEL-03: Community Manager

Step 16 of 18

Action
Pass LEL-03: Community Manager
Expected resultThe captured Preview evidence records LEL-03 with the recorded identifiers Announcement Check, Not granted, marketing lead sign-off required; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running LEL-03. A previous response must not influence the evidence.

Pass LEL-03: Community Manager reviewed visual reference

Positive visual checkpoint: marketing lead sign-off required; Announcement Check; Not granted. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

17

Pass LEL-04: Marketing Lead

Step 17 of 18

Action
Pass LEL-04: Marketing Lead
Expected resultThe captured Preview evidence records LEL-04 with the recorded identifiers Launch Summary, Submit final store assets, no reminder was sent; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running LEL-04. A previous response must not influence the evidence.

Pass LEL-04: Marketing Lead reviewed visual reference

Positive visual checkpoint: Launch Summary; Submit final store assets; no reminder was sent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

18

Confirm Draft and stop before publish

Step 18 of 18

Action
Confirm Draft and stop before publish
Expected resultThe agent remains Draft and no Publish action is taken.
Confirm Draft and stop before publish reviewed visual reference

Positive visual checkpoint: Live Event Launch Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

Troubleshooting

A screenshot or browserfilm frame is missing

Do not invent, recreate, or substitute an image. Keep the step open until its actual evidence is captured and reviewed. Remove --allow-pending only after all workshop evidence gates are met.

A knowledge file is still processing

Wait for ingestion to finish before Preview. A partial answer is not evidence.

A skill upload fails

Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.

The model differs from Easy mode

Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.

The Preview answer misses an identifier

Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.

Should I publish?

No. Keep the same owned manual agent in Draft. Do not choose Publish as part of this tutorial.