AAIBAST evidence report
Academy / Maintenance Scheduling Agent
Back to workshop

Workshop evidence

Maintenance Scheduling Agent

This report separates source-only checks, native final-answer acceptance and learner-facing visual evidence. A screenshot supports only its reviewed visible scope; it does not certify every workshop step.

35Reusable positive checkpoints
0Open or historical checkpoints excluded from current proof
0Optional future Learn-step captures

Deterministic case contract

These source-only marker checks are not, by themselves, native final-answer passes.

CaseMust includeMust not claim
MS-01 IM-07Technician AvailabilityMarcus Chen I do not have access to the synthetic pilot data
MS-02 Screw wear at 78%120 operating hours50,000 units I do not have access to the synthetic pilot data
MS-03 Saturday 6 AM - 10 AM104%No work order is created or dispatched I do not have access to the synthetic pilot data
MS-04 $3,200$18,500478% I do not have access to the synthetic pilot data
MS-05 WO-2024-3847Bin 12-ANo work order is created or dispatched I do not have access to the synthetic pilot data
MS-06 Machine #1287% plannedCalibration I do not have access to the synthetic pilot data
MS-07 Quick Wins$124KRun pilot on Line 3 I do not have access to the synthetic pilot data

Displayed visual checkpoints

Only reviewed checkpoints count within their stated scope. A labeled PNG board can combine multiple actual views; it is not an old JPEG or a continuous walkthrough. Asset paths are included for traceability.

CheckpointModeVisible evidenceAnnotated asset
easy-review-build easy Maintenance Scheduling Pilot; Draft; work-order-draft; optimization-plan; maintenance-calendar; downtime-analysis; schedule-overview; aibast_maintenance-scheduling-synthetic-records.; aibast_maintenance-scheduling-review-rules.md solutions/maintenance-scheduling/screenshots/assisted/annotated/01-review-build.png
easy-ms-01 easy IM-07; Technician Availability; Marcus Chen solutions/maintenance-scheduling/screenshots/assisted/annotated/02-ms-01.png
easy-ms-02 easy Screw wear at 78%; 120 operating hours; 50,000 units solutions/maintenance-scheduling/screenshots/assisted/annotated/03-ms-02.png
easy-ms-03 easy No work order is created or dispatched; Saturday 6 AM - 10 AM; 104% solutions/maintenance-scheduling/screenshots/assisted/annotated/04-ms-03.png
easy-ms-04 easy $3,200; $18,500; 478% solutions/maintenance-scheduling/screenshots/assisted/annotated/05-ms-04.png
easy-ms-05 easy WO-2024-3847; No work order is created or dispatched; Bin 12-A solutions/maintenance-scheduling/screenshots/assisted/annotated/06-ms-05.png
easy-ms-06 easy Calibration; Machine #12; 87% planned solutions/maintenance-scheduling/screenshots/assisted/annotated/07-ms-06.png
easy-ms-07 easy Quick Wins; $124K; Run pilot on Line 3 solutions/maintenance-scheduling/screenshots/assisted/annotated/08-ms-07.png
easy-confirm-draft easy Maintenance Scheduling Pilot solutions/maintenance-scheduling/screenshots/assisted/annotated/09-confirm-draft.png
hard-step-01 hard Untitled Agent solutions/maintenance-scheduling/screenshots/manual/annotated/01-create-blank-agent.png
hard-step-02 hard Maintenance Scheduling Manual solutions/maintenance-scheduling/screenshots/manual/annotated/02-name-agent.png
hard-step-03 hard Maintenance Scheduling Agent — Manual Global Ins solutions/maintenance-scheduling/screenshots/manual/annotated/03-enter-instructions.png
hard-step-04 hard Draft solutions/maintenance-scheduling/screenshots/manual/annotated/04-save-instructions.png
hard-step-05 hard Provide trusted context to guide decisions solutions/maintenance-scheduling/screenshots/manual/annotated/05-remove-web-search.png
hard-step-06 hard aibast_maintenance-scheduling-review-rules.md solutions/maintenance-scheduling/screenshots/manual/annotated/06-add-aibast-maintenance-scheduling-review-rules.png
hard-step-07 hard aibast_maintenance-scheduling-synthetic-records. solutions/maintenance-scheduling/screenshots/manual/annotated/07-add-aibast-maintenance-scheduling-synthetic-records.png
hard-step-08 hard downtime-analysis solutions/maintenance-scheduling/screenshots/manual/annotated/08-add-aibast-downtime-analysis-04.png
hard-step-09 hard maintenance-calendar solutions/maintenance-scheduling/screenshots/manual/annotated/09-add-aibast-maintenance-calendar-06.png
hard-step-10 hard optimization-plan solutions/maintenance-scheduling/screenshots/manual/annotated/10-add-aibast-optimization-plan-07.png
hard-step-11 hard predictive-alerts solutions/maintenance-scheduling/screenshots/manual/annotated/11-add-aibast-predictive-alerts-02.png
hard-step-12 hard schedule-overview solutions/maintenance-scheduling/screenshots/manual/annotated/12-add-aibast-schedule-overview-01.png
hard-step-13 hard work-order-draft solutions/maintenance-scheduling/screenshots/manual/annotated/13-add-aibast-work-order-draft-05.png
hard-step-14 hard work-order-plan solutions/maintenance-scheduling/screenshots/manual/annotated/14-add-aibast-work-order-plan-03.png
hard-step-15 hard Claude Opus 5; work-order-plan; work-order-draft; schedule-overview; predictive-alerts; optimization-plan; aibast_maintenance-scheduling-synthetic-records.; aibast_maintenance-scheduling-review-rules.md solutions/maintenance-scheduling/screenshots/manual/annotated/15-review-inventory.png
hard-step-16 hard work-order-plan; maintenance-calendar; work-order-draft; schedule-overview; predictive-alerts solutions/maintenance-scheduling/screenshots/manual/annotated/16-review-skills.png
hard-step-17 hard schedule-overview; maintenance-calendar; predictive-alerts; optimization-plan; downtime-analysis solutions/maintenance-scheduling/screenshots/manual/annotated/17-review-skills-more.png
hard-step-18 hard Maintenance Scheduling Manual solutions/maintenance-scheduling/screenshots/manual/annotated/18-open-preview.png
hard-ms-01 hard IM-07; Technician Availability; Marcus Chen solutions/maintenance-scheduling/screenshots/manual/annotated/19-ms-01.png
hard-ms-02 hard Screw wear at 78%; 120 operating hours; 50,000 units solutions/maintenance-scheduling/screenshots/manual/annotated/20-ms-02.png
hard-ms-03 hard No work order is created or dispatched; Saturday 6 AM - 10 AM; 104% solutions/maintenance-scheduling/screenshots/manual/annotated/21-ms-03.png
hard-ms-04 hard $3,200; $18,500; 478% solutions/maintenance-scheduling/screenshots/manual/annotated/22-ms-04.png
hard-ms-05 hard No work order is created or dispatched; WO-2024-3847; Bin 12-A solutions/maintenance-scheduling/screenshots/manual/annotated/23-ms-05.png
hard-ms-06 hard Calibration; Machine #12; 87% planned solutions/maintenance-scheduling/screenshots/manual/annotated/24-ms-06.png
hard-ms-07 hard Quick Wins; $124K; Run pilot on Line 3 solutions/maintenance-scheduling/screenshots/manual/annotated/25-ms-07.png
hard-step-26 hard Maintenance Scheduling Manual solutions/maintenance-scheduling/screenshots/manual/annotated/26-confirm-draft.png

Reference-only visual gaps

These checkpoints remain open or reference historical captures. No current image is implied by this table; review and reshoot requirements must be resolved before acceptance.

CheckpointModeSource assetReason

Downloads for audit

Download source-only transcripts Download visual checkpoint contract Download export manifest Download portable bundle Download Copilot Studio solutionDeployment settingsExport details