Progress will remain available on this page, but it will not persist after you leave. Easy Mode remains available.
About this workshop
Workshop mission: Turn motivated, open-minded, non-technical sales professionals into AI superheroes who can match the practical output and problem-solving pace of technical peers who are not using AI, while staying evidence-grounded, governed, and honest about what the tools proved.
Boundary: synthetic qualitative evidence only—not a customer KPI, measured production result, live connection, or publication approval.
Found something inaccurate? Use Report an issue at that point. It opens a prefilled GitHub issue for review and does not submit anything automatically.
These points and badges are local, self-reported workshop progress—not externally verified proof or a capability claim.
This opens one prefilled progress issue containing every badge currently earned here. Nothing syncs until you submit it. Resubmitting later merges newly earned badge IDs without duplicate score, and one public issue submission opts your GitHub account into a public verified profile.
1
Workshop setup
Open GitHub Copilot Chat
Start in GitHub Copilot Chat. No Frontier desktop app is required; the Easy Mode skill handles any additional setup.
Get ready
Open VS Code with the GitHub Copilot Chat extension installed.
Sign in to GitHub with an account that has Copilot access.
Open the Copilot Chat panel and select Agent mode.
Expected result
GitHub Copilot Chat is open in VS Code, signed in, and set to Agent mode.
What you will learn
Use the single Easy Mode skill.
Build and prove the portable agent.
Deploy the reviewed solution as an unpublished Draft.
Confirm the behavior yourself in Copilot Studio Preview.
Recognize the evidence that means the module is complete.
Before you begin
Use VS Code with GitHub Copilot Chat in Agent mode.
Sign in to GitHub with Copilot access.
Have access to a Copilot Studio environment.
The skill handles setup for you.
Do not publish. This module ends with a validated Draft.
Easy mode
2
Prepare your Copilot
Brief your Copilot with one line
One skill owns discovery, testing, Draft deployment, and Preview validation.
Do this
Open GitHub Copilot Chat in VS Code and select Agent mode.
Paste this one line and send it. Copilot reads the skill itself; nothing to download.
Send this message
Go and read https://raw.githubusercontent.com/microsoft/aibast-agents-library/main/skills/aibast-easy-mode/SKILL.md and run the Supply Chain Disruption Alert workshop for me.
Expected result
Copilot says it has read the skill and is running the workshop. The skill owns the remaining setup and validation.
3
Prove the solution locally
Ask Easy Mode to build and test Supply Chain Disruption Alert
This step proves the portable business logic before any Copilot Studio work begins. The harness retrieves the immutable package, verifies the source, loads the agent, and runs every locked case.
Send this message
Give me Supply Chain Disruption Alert using Easy Mode and test it for me.
Expected result
Copilot reports a verified source and 10/10 locked local cases passed.
Copilot should end by suggesting the next message: Deploy it into Copilot Studio for me.
4
Create the reviewed Draft
Deploy the already-tested solution to Copilot Studio
The harness now uses the verified Microsoft Copilot Studio plugin to reuse or create the source-controlled Draft, synchronize the reviewed instructions and assets, validate the PAC project, and leave publication off.
Send this message
Deploy it into Copilot Studio for me.
Expected result
Draft: Supply Chain Disruption Manual
Model: Claude Opus 5
Knowledge files: 2
Skills: 10
Status: Draft; published: false
The harness then validates the real Preview front door before returning its final verdict.
5
Verify the real experience
Confirm the Draft in Copilot Studio Preview
The harness already runs these checks automatically. Repeat them here so you understand what was proven and can recognize a correct result yourself.
Open the validated Draft.
Select Preview.
Choose New chat before each case.
Paste the exact prompt.
Compare the answer with the required and forbidden markers.
Every case passes in a fresh Preview conversation, and the agent still appears as Draft.
SUPPLY_CHAIN_DISRUPTION_ALERT-01 · Customer Fulfillment Lead
Confirm the expected evidence
Which active disruption has the largest modeled impact and what is affected?
Must include
DISR-002$3,800,000.00SKU-1010
Must not claim
No unsupported side effect
Visible positive anchors: DISR-002; $3,800,000.00; SKU-1010. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
Visible positive anchors: Asia-Pacific Primary; HIGH; Weather. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
Draft a DISR-002 mitigation scenario without rerouting or moving inventory.
Must include
DISR-002Draft Disruption Mitigation Scenariono purchase order
Must not claim
No unsupported side effect
Visible positive anchors: Draft Disruption Mitigation Scenario; DISR-002; no purchase order. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
Show Electronics alternatives without activating a supplier.
Must include
TechSource Taiwandue diligencehuman approval
Must not claim
No unsupported side effect
Visible positive anchors: due diligence; TechSource Taiwan; human approval. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
I'm seeing unusual inventory movement at our Northwest stores. Can you help me understand what's happening?
Must include
Portland DC143 products$84,300/week
Must not claim
I do not have accessI cannot help
Visible positive anchors: Portland DC; 143 products; $84,300/week. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
SUPPLY_CHAIN_DISRUPTION_ALERT-06 · Regional Operations Director
Confirm the expected evidence
What are our emergency options and costs?
Must include
Denver DC Emergency Transfer$15,6003:1
Must not claim
I do not have accessI cannot help
Visible positive anchors: Denver DC Emergency Transfer; $15,600. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
SUPPLY_CHAIN_DISRUPTION_ALERT-07 · Store Operations Manager
Confirm the expected evidence
Approved. Execute both Seattle and the 5 additional stores.
Must include
ready to release$24,500$78,000
Must not claim
I do not have accessI cannot help
Visible positive anchors: ready to release; $24,500; $78,000. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
SUPPLY_CHAIN_DISRUPTION_ALERT-08 · Distribution Center Manager
Confirm the expected evidence
Activate tracking and show me the Portland DC recovery plan.
Must include
Conveyor repair340 pending ordersFriday noon
Must not claim
I do not have accessI cannot help
Visible positive anchors: Conveyor repair; 340 pending orders. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
SUPPLY_CHAIN_DISRUPTION_ALERT-09 · Finance Business Partner
Confirm the expected evidence
Create the executive report with financial impact.
Must include
Executive Incident Report$53,50047 minutes
Must not claim
I do not have accessI cannot help
Visible positive anchors: Executive Incident Report; $53,500; 47 minutes. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
SUPPLY_CHAIN_DISRUPTION_ALERT-10 · Supply Chain Director
Confirm the expected evidence
Distribute the report and summarize what we accomplished.
Must include
Crisis Response Summarynot sentall 47 stores
Must not claim
I do not have accessI cannot help
Visible positive anchors: Crisis Response Summary; not sent; all 47 stores. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
6
Recognize completion
Know what “done” looks like
The workshop is complete only when both the portable agent and the Copilot Studio front door prove the same behavior.
Local proof10/10 locked cases passedPreview proof10/10 locked cases passedDraft identitySupply Chain Disruption ManualModelClaude Opus 5Inventory2 knowledge · 10 skillsPublication gateDraft · published false
The harness reports status: complete, exact case totals, the Draft identity, and published: false. The module ends here; it does not offer publication.
Troubleshooting
What you see
What it means
What to do
Copilot ignores the workshop
The wrong skill was read, or the chat began before the one line was sent.
Start a new Agent-mode chat and send the one line first.
Local validation is not 10/10
The portable source, package, or locked behavior does not match.
Stop. Do not deploy. Let the harness report the exact failed case and marker.
No active Copilot Studio environment
PAC has no selected environment.
Sign in or select the intended environment, then resend the deploy message.
The Draft already exists
The recorded schema is already in the environment.
The harness should clone and reconnect automatically. Treat an attendee choice prompt as a harness defect.
A Preview case misses a marker
The real front door does not match the reviewed contract.
Keep the case failed. Inspect instructions and assets; do not retry until it happens to pass.
The agent is Published
The workshop crossed its safety boundary.
Stop immediately. The module must end at Draft with published: false.
Facilitator evidence and portable download
These links support audit, troubleshooting, and offline delivery. They are not learner steps.
See how Supply Chain Disruption Alert Agent is built, one capability at a time.
Optional. Easy mode already did all of this for you from one skill file. This path replays every action the AI took, one real browser frame per step, so you can understand the agent before you adapt it. No PAC CLI, YAML import, or plugin architect; stop at Draft.
Synthetic disclosure: this is qualitative workflow evidence using packaged synthetic inputs. It is not a customer KPI or a live-system result.
Found something inaccurate? Use Report an issue on that step. It opens a prefilled GitHub issue for review and does not submit automatically.
Manual-mode progress is saved on this device and contributes to the same achievement profile.
Build and verify
1
Create a blank Copilot Studio agent
Step 1 of 32
Action
Create a blank Copilot Studio agent
Expected resultA blank Copilot Studio agent is visible in the captured Draft workspace.
Positive visual checkpoint: Untitled Agent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
2
Name Supply Chain Disruption Manual
Step 2 of 32
Action
Supply Chain Disruption Manual
Name Supply Chain Disruption Manual
Expected resultThe page header shows the recorded manual build name: Supply Chain Disruption Manual.
Positive visual checkpoint: Supply Chain Disruption Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
3
Enter the reviewed global instructions
Step 3 of 32
Action
# Supply Chain Disruption Alert Agent — Manual Global Instructions
Use only the uploaded synthetic knowledge and operation skills. Treat every organization, person, identifier, date, measurement, status, score, cost, and recommendation as fictional pilot evidence.
## Boundaries
- Never activate a supplier, change a purchase order, reroute a shipment, contact a counterparty, or move inventory. Procurement and operations owners approve every action through authenticated systems.
- Do not browse for replacement facts or invent missing records.
- Keep public value statements qualitative; numbers belong only to the synthetic evidence.
- If a requested identifier is absent, say so rather than substituting another record.
- A model response is never evidence that an external action occurred.
## Routing
- Use **disruption dashboard** for Customer Fulfillment Lead questions like: “Which active disruption has the largest modeled impact and what is affected?”
- Use **risk assessment** for Supply Chain Planner questions like: “Why is RT-APAC-01 high risk?”
- Use **mitigation plan** for Operations Leader questions like: “Draft a DISR-002 mitigation scenario without rerouting or moving inventory.”
- Use **supplier alternatives** for Procurement Manager questions like: “Show Electronics alternatives without activating a supplier.”
- Use **root cause analysis** for Regional Retail Manager questions like: “I'm seeing unusual inventory movement at our Northwest stores. Can you help me understand what's happening?”
- Use **emergency options** for Regional Operations Director questions like: “What are our emergency options and costs?”
- Use **transfer plan** for Store Operations Manager questions like: “Approved. Execute both Seattle and the 5 additional stores.”
- Use **recovery plan** for Distribution Center Manager questions like: “Activate tracking and show me the Portland DC recovery plan.”
- Use **incident report** for Finance Business Partner questions like: “Create the executive report with financial impact.”
- Use **incident summary** for Supply Chain Director questions like: “Distribute the report and summarize what we accomplished.”
- Demo walkthrough: a Portland DC conveyor failure causes stockouts at 12 Northwest stores (143 SKUs, $84,300/week). Call the agent right away; every walkthrough operation has demo defaults. An approval ('execute', 'distribute') returns a ready-to-release draft; nothing is dispatched, notified or sent.
## Response contract
1. Lead with the specific synthetic record and operation result.
2. Explain the source evidence and material uncertainty.
3. Separate analysis or drafting from any future write action.
4. Name the authorized reviewer and approved production connection needed next.
5. End with the no-write boundary relevant to the operation.
<!-- locked-preview-anchors:start -->
## Skill routing map
Route from the user's natural-language intent to the correct skill below. Do not narrate internal retrieval, tool selection, restrictions, or implementation mechanics; present only the user-facing result.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-01` uses skill `supply-chain-disruption-alert-disruption-dashboard`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-02` uses skill `supply-chain-disruption-alert-risk-assessment`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-03` uses skill `supply-chain-disruption-alert-mitigation-plan`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-04` uses skill `supply-chain-disruption-alert-supplier-alternatives`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-05` uses skill `root-cause-analysis`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-06` uses skill `emergency-options`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-07` uses skill `transfer-plan`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-08` uses skill `recovery-plan`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-09` uses skill `incident-report`.
- `SUPPLY_CHAIN_DISRUPTION_ALERT-10` uses skill `incident-summary`.
These skill names above are the ONLY valid skill identifiers. Never invent, guess, or reference any other skill name. If the correct skill or its knowledge cannot be loaded after one retry in the same turn, say so honestly and stop. Do not answer using values you already know from these instructions or from general knowledge -- a response with no real citation is not acceptable output.
<!-- locked-preview-anchors:end -->
Enter the reviewed global instructions
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Positive visual checkpoint: Supply Chain Disruption Alert Agent — Manual Glo. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
4
Save the instruction policy
Step 4 of 32
Action
Save the instruction policy
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Positive visual checkpoint: Draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
5
Remove default web search
Step 5 of 32
Action
Remove default web search
Expected resultThe captured inventory no longer lists the default web-search capability.
Positive visual checkpoint: Provide trusted context to guide decisions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: supply-chain-disruption-alert-rules-and-controls. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: supply-chain-disruption-alert-synthetic-records.. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
8
Add skill: aibast_disruption-dashboard_01
Step 8 of 32
Action
Add skill: aibast_disruption-dashboard_01
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: supply-chain-disruption-alert-disruption-dashboa. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
9
Add skill: aibast_emergency-options_06
Step 9 of 32
Action
Add skill: aibast_emergency-options_06
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: emergency-options. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
10
Add skill: aibast_incident-report_09
Step 10 of 32
Action
Add skill: aibast_incident-report_09
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: incident-report. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
11
Add skill: aibast_incident-summary_10
Step 11 of 32
Action
Add skill: aibast_incident-summary_10
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: incident-summary. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
12
Add skill: aibast_mitigation-plan_03
Step 12 of 32
Action
Add skill: aibast_mitigation-plan_03
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: supply-chain-disruption-alert-mitigation-plan. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
13
Add skill: aibast_recovery-plan_08
Step 13 of 32
Action
Add skill: aibast_recovery-plan_08
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: recovery-plan. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
14
Add skill: aibast_risk-assessment_02
Step 14 of 32
Action
Add skill: aibast_risk-assessment_02
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: supply-chain-disruption-alert-risk-assessment. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
15
Add skill: aibast_root-cause-analysis_05
Step 15 of 32
Action
Add skill: aibast_root-cause-analysis_05
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: root-cause-analysis. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
16
Add skill: aibast_supplier-alternatives_04
Step 16 of 32
Action
Add skill: aibast_supplier-alternatives_04
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: supply-chain-disruption-alert-supplier-alternati. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
17
Add skill: aibast_transfer-plan_07
Step 17 of 32
Action
Add skill: aibast_transfer-plan_07
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: transfer-plan. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
18
Review model, skills, knowledge, and safety boundaries
Step 18 of 32
Action
Review model, skills, knowledge, and safety boundaries
Expected resultThe screenshot visibly confirms Claude Opus 5, 10 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Positive visual checkpoint: Claude Opus 5; transfer-plan; supply-chain-disruption-alert-supplier-alternati; root-cause-analysis; supply-chain-disruption-alert-risk-assessment; recovery-plan; supply-chain-disruption-alert-synthetic-records.; supply-chain-disruption-alert-rules-and-controls. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
19
Review the skill list (10 skills)
Step 19 of 32
Action
Review the skill list (10 skills)
Expected resultThe screenshot visibly confirms Claude Opus 5, 10 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Positive visual checkpoint: transfer-plan; supply-chain-disruption-alert-supplier-alternati; root-cause-analysis; supply-chain-disruption-alert-risk-assessment. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
20
Review the rest of the skill list
Step 20 of 32
Action
Review the rest of the skill list
Expected resultThe screenshot visibly confirms Claude Opus 5, 10 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Positive visual checkpoint: recovery-plan; supply-chain-disruption-alert-mitigation-plan; incident-summary; incident-report; emergency-options; supply-chain-disruption-alert-disruption-dashboa. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
21
Open a fresh Preview conversation
Step 21 of 32
Action
Open a fresh Preview conversation
Expected resultA fresh Preview surface or its recorded qualitative result is visible; only the evidence file defines a pass.
Positive visual checkpoint: Supply Chain Disruption Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
22
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-01: Customer Fulfillment Lead
Step 22 of 32
Action
Which active disruption has the largest modeled impact and what is affected?
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-01: Customer Fulfillment Lead
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-01 with the recorded identifiers DISR-002, $3,800,000.00, SKU-1010; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-01. A previous response must not influence the evidence.
Positive visual checkpoint: $3,800,000.00; DISR-002; SKU-1010. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-02 with the recorded identifiers Asia-Pacific Primary, HIGH, Weather; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-02. A previous response must not influence the evidence.
Positive visual checkpoint: Asia-Pacific Primary; HIGH; Weather. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-03 with the recorded identifiers DISR-002, Draft Disruption Mitigation Scenario, no purchase order; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-03. A previous response must not influence the evidence.
Positive visual checkpoint: Draft Disruption Mitigation Scenario; DISR-002. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-04 with the recorded identifiers TechSource Taiwan, due diligence, human approval; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-04. A previous response must not influence the evidence.
Positive visual checkpoint: due diligence; TechSource Taiwan; human approval. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-05 with the recorded identifiers Portland DC, 143 products, $84,300/week; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-05. A previous response must not influence the evidence.
Positive visual checkpoint: Portland DC; $84,300/week. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
27
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-06: Regional Operations Director
Step 27 of 32
Action
What are our emergency options and costs?
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-06: Regional Operations Director
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-06 with the recorded identifiers Denver DC Emergency Transfer, $15,600, 3:1; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-06. A previous response must not influence the evidence.
Positive visual checkpoint: Denver DC Emergency Transfer; $15,600; 3:1. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
28
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-07: Store Operations Manager
Step 28 of 32
Action
Approved. Execute both Seattle and the 5 additional stores.
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-07: Store Operations Manager
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-07 with the recorded identifiers ready to release, $24,500, $78,000; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-07. A previous response must not influence the evidence.
Positive visual checkpoint: ready to release; $24,500; $78,000. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
29
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-08: Distribution Center Manager
Step 29 of 32
Action
Activate tracking and show me the Portland DC recovery plan.
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-08: Distribution Center Manager
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-08 with the recorded identifiers Conveyor repair, 340 pending orders, Friday noon; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-08. A previous response must not influence the evidence.
Positive visual checkpoint: Conveyor repair; Friday noon; 340 pending orders. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
30
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-09: Finance Business Partner
Step 30 of 32
Action
Create the executive report with financial impact.
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-09: Finance Business Partner
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-09 with the recorded identifiers Executive Incident Report, $53,500, 47 minutes; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-09. A previous response must not influence the evidence.
Positive visual checkpoint: Executive Incident Report; $53,500; 47 minutes. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
31
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-10: Supply Chain Director
Step 31 of 32
Action
Distribute the report and summarize what we accomplished.
Pass SUPPLY_CHAIN_DISRUPTION_ALERT-10: Supply Chain Director
Expected resultThe captured Preview evidence records SUPPLY_CHAIN_DISRUPTION_ALERT-10 with the recorded identifiers Crisis Response Summary, not sent, all 47 stores; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running SUPPLY_CHAIN_DISRUPTION_ALERT-10. A previous response must not influence the evidence.
Positive visual checkpoint: Crisis Response Summary; not sent; all 47 stores. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
32
Confirm Draft and stop before publish
Step 32 of 32
Action
Confirm Draft and stop before publish
Expected resultThe agent remains Draft and no Publish action is taken.
Positive visual checkpoint: Supply Chain Disruption Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Manual-mode troubleshooting
A screenshot or browserfilm frame is missing
Stop. Do not invent, recreate, or substitute an image. Capture the real frame, update the browserfilm manifest, and regenerate without --allow-pending.
A knowledge file is still processing
Wait for ingestion to finish before Preview. A partial answer is not evidence.
A skill upload fails
Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.
The model differs from Easy mode
Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.
The Preview answer misses an identifier
Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.
Should I publish?
No. Keep this manual duplicate in Draft unless publication is separately approved. Do not choose Publish as part of this tutorial.