Summary

Short design docs align intent, surface risks early, and create durable knowledge. They replace expensive late PR debates with quick, high‑quality implementation and review cycles.

Purpose and Benefits

  • Shared Context Before Code: Ensures reviewers agree on approach, preventing rework.
  • Higher Quality Implementation: Edge cases and test strategy considered upfront.
  • Faster Reviews: PR feedback focuses on details, not fundamental direction changes.
  • Knowledge Base: Future maintainers can reconstruct why decisions were made.
  • Onboarding Accelerator: New contributors read similar docs to ramp and confidently propose work.
  • Metrics and Predictability: Early sizing and estimated completion date highlight mismatches in understanding.

Minimal Template

Keep it lean. Optimize for clarity, not prose. (Full copyable version: see Templates & Examples.)

  1. Elevator Pitch (value, for whom, why now)
  2. Definition of Done (quality and outcome bullets)
  3. Customer / Consumer (validator role)
  4. Dependencies and Assumptions
  5. Design and Testing Approach
  6. Task List (implementation, tests, monitoring, docs, rollout)
  7. Estimated Completion (95% confidence date)
  8. Signoffs (2 peers)
  9. Implementation Notes (filled as work proceeds)

Signoff Process

  • Draft ready when all sections above have initial content.
  • Two peers review and either approve or request clarifications.
  • Questions resolved asynchronously; doc updated to reflect any changes. Multiple rounds of updates may warrant a meeting to discuss.
  • Only after two signoffs does engineering begin (unless a time‑critical swarm demands parallelization. This is rare and deliberate).

During Implementation

  • Keep doc open; append key discoveries, changed assumptions, data sources.
  • If a major pivot emerges (e.g., architectural change), pause and re‑review. Treat it like a micro design revision.
  • Mark any deferred follow‑ups explicitly instead of silently expanding scope.

Common Pitfalls and Avoidance

Pitfall Consequence Mitigation
Skipping docs for "small" changes Hidden coupling, repeated fixes Keep even smaller docs, perhaps 5 bullet points
Writing essays Slow to author and review, goes stale Favor bullet lists and diagrams over paragraphs
Signoff theater (“LGTM” without reading) False confidence Rotate reviewers; ask clarifying questions
Letting divergences accumulate PR surprises Update doc immediately on direction changes

Reviewer Checklist

  • Does the Definition of Done capture validation and quality signals?
  • Are major risks and dependencies acknowledged?
  • Does the planned design fit with the existing architecture?
  • Are there existing tools or resources that the author is unaware of?
  • Can one person reasonably finish this within the SLA?
  • Is the test/monitoring approach explicit?
  • Are follow‑up items clearly out of scope?