Workflow & Board Anatomy

Summary

The board (physical or digital) is the single shared model of current work. It makes flow, bottlenecks, priorities, and collaboration needs obvious at a glance.

Board Concept

Each ticket advances left to right through clearly defined stages (columns). Horizontal lanes (rails) categorize urgency or work type. A healthy board lets any observer answer: What's most urgent? What's blocked? Who needs help next?

Board Diagram

Sample board showing the columns and rails described below along with tickets of various colors indicating which workstream they belong to

Columns

Columns reflect state changes in learning and validation, not just coding steps. Suggested baseline:

  1. Backlog – Candidate items with potential value but not yet committed. Anyone can propose. Acceptance criteria not guaranteed complete.
  2. Ready – Highest‑priority, well‑understood items with clear acceptance criteria and initial sizing. Pull from here when you start new work. Coach filles this column with tickets from the Backlog.
  3. Analyze – Shepherd prepares or updates a lightweight design doc, confirms assumptions, and obtains 2 or more peer signoffs.
  4. Engineer – Implementation and tests and instrumentation. Peer reviews (2 or more) required before moving forward.
  5. Release – Code merges and deploys with feature flags or incremental rollout if applicable. Monitoring/observability is verified.
  6. Customer Validation – Stakeholder / user confirms value delivered or provides immediate feedback loop.
  7. Done – Definition of Done fully met and learnings captured for the retrospective.

Column Exit Criteria

Before a ticket moves to the next column, it must pass a set of exit criteria.

  • Backlog
    • Consensus that ticket represents most immediate business value
    • Acceptance criteria defined
  • Ready
    • Has shepherd and start date
  • Analyze
    • Design document written
    • Design document signed off by two people
  • Engineer
    • All required tests pass
    • Code review signed off by two people
  • Released
    • Passed Coach/PM acceptance review
    • Code checked in
    • Code integrated into solution without mocks
    • Code officially released to production
  • Customer Validation
    • Customer validated as Done
    • New backlog items if needed
  • Done
    • Relevant team learnings captured at retrospective

Rails

Rails (aka swimlanes) categorize tickets by urgency or intent without mixing them visually.

  • Swarm – Highest priority customer‑impacting issues. The team stops and collaborates. Target turnaround typically < 24 business hours.
  • Interrupt – Unexpected but important asks (e.g., compliance request, executive demo). Limit active count (often 1) to protect focus.
  • Planned – The steady value stream of intentionally prioritized work. Most capacity should live here.

Optional rails:

  • Time Off – Visualize availability.
  • Tracking – Items mostly waiting on external parties. Use retrospectives to reduce reliance on this lane because it can hide flow debt. Ideally all external dependencies are resolved before a ticket is moved to Ready.
  • Lead / Manager – Long‑tail tasks owned by roles with fragmented time; isolates their slower cadence from standard WIP metrics.

Flow Example

  1. Backlog item is refined during planning; Coach moves it to Ready.
  2. Engineer pulls it into Analyze, drafts design doc, gets two signoffs.
  3. Moves to Engineer; implementation and tests and two PR reviews.
  4. Deployed under Release; monitoring shows healthy.
  5. Customer validates; feedback minor then Done.

Backward Movement Policy

Tickets should almost never move left. When they do (e.g., from Release back to Engineer due to a defect) the team records it and reviews the root cause in the next retrospective. It is treated as an optimization signal, not blame.