AAIBAST manual workshop
Academy / Regulatory Reporting Agent
Watch the manual film Back to workshopDownload source bundle

Manual mode · literal browser construction

Build Regulatory Reporting Agent manually.

No PAC CLI, YAML import, or plugin architect. Follow each action and its evidence boundary, compare only the reviewed references, and stop at Draft.

Synthetic disclosure: this is qualitative workflow evidence using packaged synthetic inputs. It is not a customer KPI or a live-system result.

Build and verify

1

Create a blank Copilot Studio agent

Step 1 of 24

Action
Create a blank Copilot Studio agent
Expected resultA blank Copilot Studio agent is visible in the captured Draft workspace.
Create a blank Copilot Studio agent reviewed visual reference

Positive visual checkpoint: Untitled Agent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

2

Name Regulatory Reporting Manual

Step 2 of 24

Action
Name Regulatory Reporting Manual
Expected resultThe page header shows the recorded manual build name: Regulatory Reporting Manual.
Name Regulatory Reporting Manual reviewed visual reference

Positive visual checkpoint: Regulatory Reporting Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

3

Enter the reviewed global instructions

Step 3 of 24

Action
Enter the reviewed global instructions
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Enter the reviewed global instructions reviewed visual reference

Positive visual checkpoint: Regulatory Reporting Agent — Manual Global Instr. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

4

Save the instruction policy

Step 4 of 24

Action
Save the instruction policy
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Save the instruction policy reviewed visual reference

Positive visual checkpoint: Draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

5

Remove default web search

Step 5 of 24

Action
Remove default web search
Expected resultThe captured inventory no longer lists the default web-search capability.
Remove default web search reviewed visual reference

Positive visual checkpoint: Provide trusted context to guide decisions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

6

Add knowledge: energy-regulatory-reporting-rules-and-controls.md

Step 6 of 24

Action
Add knowledge: energy-regulatory-reporting-rules-and-controls.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: energy-regulatory-reporting-rules-and-controls.md reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-rules-and-controls.m. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

7

Add knowledge: energy-regulatory-reporting-synthetic-records.md

Step 7 of 24

Action
Add knowledge: energy-regulatory-reporting-synthetic-records.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: energy-regulatory-reporting-synthetic-records.md reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-synthetic-records.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

8

Add skill: aibast_audit-readiness_04

Step 8 of 24

Action
Add skill: aibast_audit-readiness_04
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_audit-readiness_04 reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-audit-readiness. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

9

Add skill: aibast_data-validation_02

Step 9 of 24

Action
Add skill: aibast_data-validation_02
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_data-validation_02 reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-data-validation. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

10

Add skill: aibast_emissions-summary_05

Step 10 of 24

Action
Add skill: aibast_emissions-summary_05
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_emissions-summary_05 reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-emissions-summary. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

11

Add skill: aibast_prepare-submission_06

Step 11 of 24

Action
Add skill: aibast_prepare-submission_06
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_prepare-submission_06 reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-prepare-submission. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

12

Add skill: aibast_report-status_01

Step 12 of 24

Action
Add skill: aibast_report-status_01
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_report-status_01 reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-report-status. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

13

Add skill: aibast_submission-tracker_03

Step 13 of 24

Action
Add skill: aibast_submission-tracker_03
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_submission-tracker_03 reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-submission-tracker. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

14

Review model, skills, knowledge, and safety boundaries

Step 14 of 24

Action
Review model, skills, knowledge, and safety boundaries
Expected resultThe screenshot visibly confirms Claude Opus 5, 6 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Review model, skills, knowledge, and safety boundaries reviewed visual reference

Positive visual checkpoint: Claude Opus 5; energy-regulatory-reporting-submission-tracker; energy-regulatory-reporting-report-status; energy-regulatory-reporting-prepare-submission; energy-regulatory-reporting-emissions-summary; energy-regulatory-reporting-data-validation; energy-regulatory-reporting-synthetic-records.md; energy-regulatory-reporting-rules-and-controls.m. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

15

Review the skill list (6 skills)

Step 15 of 24

Action
Review the skill list (6 skills)
Expected resultThe screenshot visibly confirms Claude Opus 5, 6 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Review the skill list (6 skills) reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-submission-tracker; energy-regulatory-reporting-report-status; energy-regulatory-reporting-prepare-submission; energy-regulatory-reporting-emissions-summary; energy-regulatory-reporting-data-validation. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

16

Review the rest of the skill list

Step 16 of 24

Action
Review the rest of the skill list
Expected resultThe screenshot visibly confirms Claude Opus 5, 6 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Review the rest of the skill list reviewed visual reference

Positive visual checkpoint: energy-regulatory-reporting-submission-tracker; energy-regulatory-reporting-report-status; energy-regulatory-reporting-prepare-submission; energy-regulatory-reporting-emissions-summary; energy-regulatory-reporting-data-validation; energy-regulatory-reporting-audit-readiness. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

17

Open a fresh Preview conversation

Step 17 of 24

Action
Open a fresh Preview conversation
Expected resultA fresh Preview surface or its recorded qualitative result is visible; only the evidence file defines a pass.
Open a fresh Preview conversation reviewed visual reference

Positive visual checkpoint: Regulatory Reporting Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

18

Pass ENERGY_REGULATORY_REPORTING-01: Regulatory Reporting Lead

Step 18 of 24

Action
Pass ENERGY_REGULATORY_REPORTING-01: Regulatory Reporting Lead
Expected resultThe captured Preview evidence records ENERGY_REGULATORY_REPORTING-01 with the recorded identifiers PHMSA Annual Pipeline Safety Report, OVERDUE, Pipeline Operations; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running ENERGY_REGULATORY_REPORTING-01. A previous response must not influence the evidence.

Pass ENERGY_REGULATORY_REPORTING-01: Regulatory Reporting Lead reviewed visual reference

Positive visual checkpoint: PHMSA Annual Pipeline Safety Report; Pipeline Operations; OVERDUE. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

19

Pass ENERGY_REGULATORY_REPORTING-02: Data Analyst

Step 19 of 24

Action
Pass ENERGY_REGULATORY_REPORTING-02: Data Analyst
Expected resultThe captured Preview evidence records ENERGY_REGULATORY_REPORTING-02 with the recorded identifiers Data collection incomplete, Data quality score below threshold, authorized report owner; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running ENERGY_REGULATORY_REPORTING-02. A previous response must not influence the evidence.

Pass ENERGY_REGULATORY_REPORTING-02: Data Analyst reviewed visual reference

Positive visual checkpoint: Data collection incomplete; Data quality score below threshold; authorized report owner. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

20

Pass ENERGY_REGULATORY_REPORTING-03: Compliance Manager

Step 20 of 24

Action
Pass ENERGY_REGULATORY_REPORTING-03: Compliance Manager
Expected resultThe captured Preview evidence records ENERGY_REGULATORY_REPORTING-03 with the recorded identifiers PHMSA Annual Pipeline Safety Report, OVERDUE, No regulator filing; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running ENERGY_REGULATORY_REPORTING-03. A previous response must not influence the evidence.

Pass ENERGY_REGULATORY_REPORTING-03: Compliance Manager reviewed visual reference

Positive visual checkpoint: PHMSA Annual Pipeline Safety Report; OVERDUE; No regulator filing. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

21

Pass ENERGY_REGULATORY_REPORTING-04: Internal Auditor

Step 21 of 24

Action
Pass ENERGY_REGULATORY_REPORTING-04: Internal Auditor
Expected resultThe captured Preview evidence records ENERGY_REGULATORY_REPORTING-04 with the recorded identifiers Pipeline mileage discrepancy, HIGH, cannot predict an audit outcome; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running ENERGY_REGULATORY_REPORTING-04. A previous response must not influence the evidence.

Pass ENERGY_REGULATORY_REPORTING-04: Internal Auditor reviewed visual reference

Positive visual checkpoint: HIGH; Pipeline mileage discrepancy; cannot predict an audit outcome. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

22

Pass ENERGY_REGULATORY_REPORTING-05: Environmental Manager

Step 22 of 24

Action
Pass ENERGY_REGULATORY_REPORTING-05: Environmental Manager
Expected resultThe captured Preview evidence records ENERGY_REGULATORY_REPORTING-05 with the recorded identifiers 14 facilities, 8.24M tons, down 7.3%; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running ENERGY_REGULATORY_REPORTING-05. A previous response must not influence the evidence.

Pass ENERGY_REGULATORY_REPORTING-05: Environmental Manager reviewed visual reference

Positive visual checkpoint: 14 facilities; 8.24M tons; down 7.3%. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

23

Pass ENERGY_REGULATORY_REPORTING-06: Regulatory Affairs Director

Step 23 of 24

Action
Pass ENERGY_REGULATORY_REPORTING-06: Regulatory Affairs Director
Expected resultThe captured Preview evidence records ENERGY_REGULATORY_REPORTING-06 with the recorded identifiers EPA_Q1_Emissions_Report.xml, 6 sections incomplete, No regulator filing; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running ENERGY_REGULATORY_REPORTING-06. A previous response must not influence the evidence.

Pass ENERGY_REGULATORY_REPORTING-06: Regulatory Affairs Director reviewed visual reference

Positive visual checkpoint: EPA_Q1_Emissions_Report.xml; No regulator filing. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

24

Confirm Draft and stop before publish

Step 24 of 24

Action
Confirm Draft and stop before publish
Expected resultThe agent remains Draft and no Publish action is taken.
Confirm Draft and stop before publish reviewed visual reference

Positive visual checkpoint: Regulatory Reporting Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

Troubleshooting

A screenshot or browserfilm frame is missing

Do not invent, recreate, or substitute an image. Keep the step open until its actual evidence is captured and reviewed. Remove --allow-pending only after all workshop evidence gates are met.

A knowledge file is still processing

Wait for ingestion to finish before Preview. A partial answer is not evidence.

A skill upload fails

Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.

The model differs from Easy mode

Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.

The Preview answer misses an identifier

Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.

Should I publish?

No. Keep the same owned manual agent in Draft. Do not choose Publish as part of this tutorial.