Manual mode · literal browser construction

Build Predictive Asset Maintenance Intelligence Agent manually.

No PAC CLI, YAML import, or plugin architect. Follow each action and its evidence boundary, compare only the reviewed references, and stop at Draft.

Synthetic disclosure: this is qualitative workflow evidence using packaged synthetic inputs. It is not a customer KPI or a live-system result.

Build and verify

1

Create a blank Copilot Studio agent

Step 1 of 18

Action
Create a blank Copilot Studio agent
Expected resultA blank Copilot Studio agent is visible in the captured Draft workspace.
Create a blank Copilot Studio agent reviewed visual reference

Positive visual checkpoint: Untitled Agent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

2

Name Predictive Asset Manual

Step 2 of 18

Action
Name Predictive Asset Manual
Expected resultThe page header shows the recorded manual build name: Predictive Asset Manual.
Name Predictive Asset Manual reviewed visual reference

Positive visual checkpoint: Predictive Asset Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

3

Enter the reviewed global instructions

Step 3 of 18

Action
Enter the reviewed global instructions
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Enter the reviewed global instructions reviewed visual reference

Positive visual checkpoint: Predictive Asset Maintenance Intelligence — Manual Global Instructions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

4

Save the instruction policy

Step 4 of 18

Action
Save the instruction policy
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Save the instruction policy reviewed visual reference

Positive visual checkpoint: Your agent has been saved; Draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

5

Remove default web search

Step 5 of 18

Action
Remove default web search
Expected resultThe captured inventory no longer lists the default web-search capability.
Remove default web search reviewed visual reference

Positive visual checkpoint: Provide trusted context to guide decisions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

6

Add knowledge: aibast_grid-asset-maintenance-rules-and-guardrails.md

Step 6 of 18

Action
Add knowledge: aibast_grid-asset-maintenance-rules-and-guardrails.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: aibast_grid-asset-maintenance-rules-and-guardrails.md reviewed visual reference

Positive visual checkpoint: aibast_grid-asset-maintenance-rules-and-guardrails.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

7

Add knowledge: aibast_grid-asset-maintenance-synthetic-records.md

Step 7 of 18

Action
Add knowledge: aibast_grid-asset-maintenance-synthetic-records.md
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Add knowledge: aibast_grid-asset-maintenance-synthetic-records.md reviewed visual reference

Positive visual checkpoint: aibast_grid-asset-maintenance-synthetic-records.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

8

Add skill: aibast_register-update_03

Step 8 of 18

Action
Add skill: aibast_register-update_03
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_register-update_03 reviewed visual reference

Positive visual checkpoint: register-update. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

9

Add skill: aibast_replacement-plan_04

Step 9 of 18

Action
Add skill: aibast_replacement-plan_04
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_replacement-plan_04 reviewed visual reference

Positive visual checkpoint: replacement-plan. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

10

Add skill: aibast_risk-ranking_01

Step 10 of 18

Action
Add skill: aibast_risk-ranking_01
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_risk-ranking_01 reviewed visual reference

Positive visual checkpoint: risk-ranking. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

11

Add skill: aibast_work-order-draft_02

Step 11 of 18

Action
Add skill: aibast_work-order-draft_02
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Add skill: aibast_work-order-draft_02 reviewed visual reference

Positive visual checkpoint: work-order-draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

12

Review model, skills, knowledge, and safety boundaries

Step 12 of 18

Action
Review model, skills, knowledge, and safety boundaries
Expected resultThe screenshot visibly confirms Model Claude Opus 5.5, 4 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Review model, skills, knowledge, and safety boundaries reviewed visual reference

Positive visual checkpoint: Model Claude Opus 5.5; work-order-draft; risk-ranking; replacement-plan; register-update; aibast_grid-asset-maintenance-synthetic-records.md; aibast_grid-asset-maintenance-rules-and-guardrails.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

13

Open a fresh Preview conversation

Step 13 of 18

Action
Open a fresh Preview conversation
Expected resultA fresh Preview surface or its recorded qualitative result is visible; only the evidence file defines a pass.
Open a fresh Preview conversation reviewed visual reference

Positive visual checkpoint: Predictive Asset Manual; New chat. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

14

Pass GAM-01: Reliability Engineer

Step 14 of 18

Action
Pass GAM-01: Reliability Engineer
Expected resultThe captured Preview evidence records GAM-01 with the recorded identifiers Grid Asset Risk Ranking, TX-0417, SG-1123; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running GAM-01. A previous response must not influence the evidence.

Pass GAM-01: Reliability Engineer reviewed visual reference

Positive visual checkpoint: Grid Asset Risk Ranking; TX-0417; SG-1123. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

15

Pass GAM-02: Maintenance Planner

Step 15 of 18

Action
Pass GAM-02: Maintenance Planner
Expected resultThe captured Preview evidence records GAM-02 with the recorded identifiers Preventive Work Order Draft, Tap changer contact kit, Substation Crew B; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running GAM-02. A previous response must not influence the evidence.

Pass GAM-02: Maintenance Planner reviewed visual reference

Positive visual checkpoint: Preventive Work Order Draft; Substation Crew B; Tap changer contact kit. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

16

Pass GAM-03: Reliability Engineer

Step 16 of 18

Action
Pass GAM-03: Reliability Engineer
Expected resultThe captured Preview evidence records GAM-03 with the recorded identifiers Asset Register Update Check, WO-55097, Insulation resistance; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running GAM-03. A previous response must not influence the evidence.

Pass GAM-03: Reliability Engineer reviewed visual reference

Positive visual checkpoint: WO-55097; Asset Register Update Check; Insulation resistance. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

17

Pass GAM-04: Director of Asset Management

Step 17 of 18

Action
Pass GAM-04: Director of Asset Management
Expected resultThe captured Preview evidence records GAM-04 with the recorded identifiers Fleet Health and Replacement Plan, TX-0417, $11,340,000; do not infer results beyond it.
Before this case

Open Preview in a fresh conversation before running GAM-04. A previous response must not influence the evidence.

Pass GAM-04: Director of Asset Management reviewed visual reference

Positive visual checkpoint: Fleet Health and Replacement Plan; $11,340,000; TX-0417. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

18

Confirm Draft and stop before publish

Step 18 of 18

Action
Confirm Draft and stop before publish
Expected resultThe agent remains Draft and no Publish action is taken.
Confirm Draft and stop before publish reviewed visual reference

Positive visual checkpoint: Predictive Asset Manual. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.

Troubleshooting

A screenshot or browserfilm frame is missing

Do not invent, recreate, or substitute an image. Keep the step open until its actual evidence is captured and reviewed. Remove --allow-pending only after all workshop evidence gates are met.

A knowledge file is still processing

Wait for ingestion to finish before Preview. A partial answer is not evidence.

A skill upload fails

Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.

The model differs from Easy mode

Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.

The Preview answer misses an identifier

Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.

Should I publish?

No. Keep the same owned manual agent in Draft. Do not choose Publish as part of this tutorial.