Challenges — AgentOps Control Tower
Build an AgentOps Control Tower on Microsoft Fabric in seven challenges. Challenges 0–5 cover setup, data ingestion, and dashboards; Challenge 6 adds operational features.
How the challenges work
- Each challenge gives you a scenario, objectives, and success criteria. Your team chooses how to
implement it, using the assets in
resources/as needed. - Follow the dependencies below.
- Show your coach the success criteria before moving on.
- Try the tasks before opening the hints. Coaches have the reference solutions.
The arc
| # | Challenge | Depends on | Est. | Theme |
|---|---|---|---|---|
| 0 | Mission Briefing & Environment Setup | — | 1–1.5 h | Access, tooling, Fabric capacity |
| 1 | Light Up the Agents | 0 | 1.5–2 h | Deploy a Foundry agent workload that emits telemetry |
| 2 | Build the Telemetry Landing Zone | 0 | 1.5–2 h | Land cost, metrics, logs & metadata in ADLS Gen2 |
| 3 | Connect Fabric to the Enterprise | 1, 2 | 2 h | Lakehouse, OneLake shortcuts, Cosmos DB Mirroring |
| 4 | Refine the Signal | 3 | 2–2.5 h | Bronze → Silver → Gold medallion + pipeline |
| 5 | Stand Up the Control Tower | 4 | 2–2.5 h | Direct Lake model + Power BI dashboards |
| 6 | Make It Operational 🏆 | 5 | 1.5–2 h | Stretch: alerts, chargeback, RLS, automation |
💡 Short on time? Challenges 1 and 2 are independent of each other and can be tackled in parallel by splitting your team. They must both finish before Challenge 3.
Scoring
Scoring is optional. Coaches can adapt this rubric and award points at each success checkpoint.
| Challenge | Base points | Bonus opportunities |
|---|---|---|
| 0 | 5 | Everyone on the team can az login + reach Fabric (+5) |
| 1 | 15 | Custom token/cost metric visible in App Insights (+5); end-to-end trace shown (+5) |
| 2 | 15 | All 5 data domains landing (+5); FOCUS cost file validated (+5) |
| 3 | 20 | Mirroring latency < 1 min demonstrated (+5); zero-copy explained to coach (+5) |
| 4 | 25 | Gold correlates cost and agent telemetry (+10); pipeline runs green end-to-end (+5) |
| 5 | 20 | All three dashboard themes built (+5); Direct Lake confirmed (+5) |
| 6 🏆 | 20 | Live alert fires (+5); chargeback by team/use case (+5); RLS (+5) |
Judging themes (for a showcase at the end): Does the Control Tower answer the three business questions — reliability, cost, performance? Is the data correlated, not just collected? Could the customer actually run on this?
What "done" looks like
At the end of Challenge 5, demonstrate how your dashboards answer:
- Which agents are healthy right now, and where are the errors? (Reliability)
- What is each agent / team / use case costing us? (Cost)
- Are we meeting our SLAs, and how much are we scaling? (Performance)
Challenge 6 adds alerts, chargeback, row-level security, and automation.
Start with Challenge 0 — Mission Briefing & Environment Setup.