Skip to main content

In this article

Tutorial: Handing Off from DT to RPI

Prerequisites​

Before starting a handoff, ensure you have:

  • A DT Coach session with a project slug, such as factory-floor-maintenance
  • Completed Methods 7-9 for the Implementation Spec Ready exit
  • A coaching state file at .copilot-tracking/dt/{project-slug}/coaching-state.md
  • A project folder at .copilot-tracking/dt/{project-slug}/
  • Familiarity with RPI workflow basics

NOTE

This tutorial continues the manufacturing scenario from Using DT Methods Together. The team discovered that the plant manager's "quality dashboard" request actually reflects a knowledge-loss problem across shifts.

Implementation Spec Ready Handoff​

The DT-to-RPI handoff can occur at three exit points: Problem Statement Complete (Methods 1-3), Concept Validated (Methods 4-6), and Implementation Spec Ready (Methods 7-9). Every exit enters the RPI pipeline through rpi-research, and later exits seed the Research phase with progressively richer context. This tutorial walks through the Implementation Spec Ready exit, which hands off the richest artifact set after Methods 7-9 are complete. The same steps apply to the earlier exits with leaner artifacts.

What the Handoff Includes​

The handoff artifact carries the richer DT evidence you gathered through the Implementation Space:

  • Architecture decisions and technical trade-offs
  • High-fidelity prototype outcomes and test evidence
  • Stakeholder and constraint context from earlier methods
  • Confidence markers for each artifact, constraint, and assumption

When you review the handoff before activating rpi-research, pay attention to items marked assumed, unknown, or conflicting. Those items become research targets for the incoming RPI work.

Step 1: Confirm Readiness with DT Coach​

After completing Method 9, ask the coach to assess readiness:

/dt-method-next

The coach reviews the completed Implementation Space work and confirms that the handoff is ready for rpi-research.

Step 2: Generate the Handoff Artifact​

Start a new chat session and run the Implementation Space handoff prompt:

/dt-handoff-implementation-space project-slug=factory-floor-maintenance

The prompt compiles the available DT artifacts, applies the current handoff contract, and produces two files in .copilot-tracking/dt/{project-slug}/:

  • handoff-summary.md: The structured handoff metadata with confidence markers
  • rpi-handoff-implementation-space.md: A self-contained document for rpi-research

Step 3: Review the Artifact​

Open rpi-handoff-implementation-space.md and verify that it includes:

  • A clear problem framing and implementation context
  • Stakeholder context, constraints, and assumptions with confidence markers
  • Evidence from High-Fidelity Prototypes, User Testing, and Iteration at Scale
  • Clear investigation targets for items marked assumed, unknown, or conflicting

Step 4: Hand Off to rpi-research​

Clear your chat context, open the generated handoff file in your editor, and invoke the Research phase skill:

/clear
/rpi-research Research implementation options for the voice-guided
repair system based on the DT handoff artifact that is open in the
editor at docs/design-thinking/factory-floor-maintenance/rpi-handoff-implementation-space.md

rpi-research uses the handoff to:

  • Scope technical research around the validated implementation context
  • Treat assumed items as verification targets
  • Treat unknown items as primary research targets
  • Pass the DT-informed findings into the standard RPI pipeline

Step 5: Continue Through RPI​

After research completes, continue with the standard RPI phases:

/clear → /rpi-plan → /clear → /rpi-implement → /clear → /rpi-review

The research artifact carries the validated DT context into planning and implementation rather than recreating it from scratch.

When RPI Returns to DT​

The handoff is not one-way. rpi-research can recommend returning to DT coaching when research reveals issues that trace back to DT assumptions. When that happens, open a new DT Coach session, restate the finding that invalidated the assumption, and resume from the earlier method that needs revision.

Quick Reference​

ActionCommand or Step
Check readiness/dt-method-next in the DT Coach session
Generate the implementation handoff/dt-handoff-implementation-space project-slug=...
Switch to RPI/clear, open the handoff artifact, then invoke /rpi-research
Return to DT from RPIStart a new @dt-coach session and describe the finding that triggered the return

🤖 Crafted with precision by ✨Copilot following brilliant human instruction, then carefully refined by our team of discerning human reviewers.