Tutorial: Handing Off from DT to RPI
Prerequisites​
Before starting a handoff, ensure you have:
- A DT Coach session with a project slug, such as
factory-floor-maintenance - Completed Methods 7-9 for the Implementation Spec Ready exit
- A coaching state file at
.copilot-tracking/dt/{project-slug}/coaching-state.md - A project folder at
.copilot-tracking/dt/{project-slug}/ - Familiarity with RPI workflow basics
NOTE
This tutorial continues the manufacturing scenario from Using DT Methods Together. The team discovered that the plant manager's "quality dashboard" request actually reflects a knowledge-loss problem across shifts.
Implementation Spec Ready Handoff​
The DT-to-RPI handoff can occur at three exit points: Problem Statement Complete (Methods 1-3), Concept Validated (Methods 4-6), and Implementation Spec Ready (Methods 7-9).
Every exit enters the RPI pipeline through rpi-research, and later exits seed the Research phase with progressively richer context.
This tutorial walks through the Implementation Spec Ready exit, which hands off the richest artifact set after Methods 7-9 are complete. The same steps apply to the earlier exits with leaner artifacts.
What the Handoff Includes​
The handoff artifact carries the richer DT evidence you gathered through the Implementation Space:
- Architecture decisions and technical trade-offs
- High-fidelity prototype outcomes and test evidence
- Stakeholder and constraint context from earlier methods
- Confidence markers for each artifact, constraint, and assumption
When you review the handoff before activating rpi-research, pay attention to items marked assumed, unknown, or conflicting. Those items become research targets for the incoming RPI work.
Step 1: Confirm Readiness with DT Coach​
After completing Method 9, ask the coach to assess readiness, or select the 🎯 Method Next handoff:
We've finished Method 9. Assess where we are and recommend the next step.
The coach reviews the completed Implementation Space work and confirms that the handoff is ready for rpi-research.
Step 2: Generate the Handoff Artifact​
In the same DT Coach session, ask the coach to package the Implementation Space for RPI:
Prepare the Implementation Space handoff to RPI for project
factory-floor-maintenance.
The coach follows the Implementation Space exit procedure from the dt-rpi-integration skill. Your request counts as the explicit handoff choice. The coach compiles the available DT artifacts, applies the current handoff contract, and produces two files:
.copilot-tracking/dt/{project-slug}/handoff-summary-implementation-space.md: The structured handoff metadata with the exit tier and confidence markers.copilot-tracking/research/{project-slug}-research-topic.md: A self-contained document forrpi-research
Step 3: Review the Artifact​
Open .copilot-tracking/research/factory-floor-maintenance-research-topic.md and verify that it includes:
- A clear problem framing and implementation context
- Stakeholder context, constraints, and assumptions with confidence markers
- Evidence from High-Fidelity Prototypes, User Testing, and Iteration at Scale
- Clear investigation targets for items marked
assumed,unknown, orconflicting
Step 4: Hand Off to rpi-research​
Clear your chat context, open the generated handoff file in your editor, and invoke the Research phase skill:
/clear
/rpi-research Research implementation options for the voice-guided
repair system based on the DT handoff artifact that is open in the
editor at .copilot-tracking/research/factory-floor-maintenance-research-topic.md
rpi-research uses the handoff to:
- Scope technical research around the validated implementation context
- Treat
assumeditems as verification targets - Treat
unknownitems as primary research targets - Pass the DT-informed findings into the standard RPI pipeline
Step 5: Continue Through RPI​
After research completes, continue with the standard RPI phases:
/clear → /rpi-plan → /clear → /rpi-implement → /clear → /rpi-review
The research artifact carries the validated DT context into planning and implementation rather than recreating it from scratch.
When RPI Returns to DT​
The handoff is not one-way. rpi-research can recommend returning to DT coaching when research reveals issues that trace back to DT assumptions. When that happens, open a new DT Coach session, restate the finding that invalidated the assumption, and resume from the earlier method that needs revision.
Quick Reference​
| Action | Command or Step |
|---|---|
| Check readiness | Select 🎯 Method Next or ask DT Coach for the next step |
| Generate the implementation handoff | Ask DT Coach to prepare the Implementation Space handoff to RPI |
| Switch to RPI | /clear, open the handoff artifact, then invoke /rpi-research |
| Return to DT from RPI | Start a new @dt-coach session and describe the finding that triggered the return |
Related Resources​
- DT to RPI Integration: Reference for the handoff contract, per-phase mappings, and confidence markers
- Using DT Methods Together: End-to-end walkthrough of all nine DT methods
- RPI Workflow: Research, Plan, Implement, Review framework
- DT Coach Guide: How to use the DT Coach agent