Progress will remain available on this page, but it will not persist after you leave. Easy Mode remains available.
About this workshop
Workshop mission: Turn motivated, open-minded, non-technical sales professionals into AI superheroes who can match the practical output and problem-solving pace of technical peers who are not using AI, while staying evidence-grounded, governed, and honest about what the tools proved.
Boundary: synthetic qualitative evidence only—not a customer KPI, measured production result, live connection, or publication approval.
Found something inaccurate? Use Report an issue at that point. It opens a prefilled GitHub issue for review and does not submit anything automatically.
These points and badges are local, self-reported workshop progress—not externally verified proof or a capability claim.
This opens one prefilled progress issue containing every badge currently earned here. Nothing syncs until you submit it. Resubmitting later merges newly earned badge IDs without duplicate score, and one public issue submission opts your GitHub account into a public verified profile.
1
Workshop setup
Open GitHub Copilot Chat
Start in GitHub Copilot Chat. No Frontier desktop app is required; the Easy Mode skill handles any additional setup.
Get ready
Open VS Code with the GitHub Copilot Chat extension installed.
Sign in to GitHub with an account that has Copilot access.
Open the Copilot Chat panel and select Agent mode.
Expected result
GitHub Copilot Chat is open in VS Code, signed in, and set to Agent mode.
What you will learn
Use the single Easy Mode skill.
Build and prove the portable agent.
Deploy the reviewed solution as an unpublished Draft.
Confirm the behavior yourself in Copilot Studio Preview.
Recognize the evidence that means the module is complete.
Before you begin
Use VS Code with GitHub Copilot Chat in Agent mode.
Sign in to GitHub with Copilot access.
Have access to a Copilot Studio environment.
The skill handles setup for you.
Do not publish. This module ends with a validated Draft.
Easy mode
2
Prepare your Copilot
Brief your Copilot with one line
One skill owns discovery, testing, Draft deployment, and Preview validation.
Do this
Open GitHub Copilot Chat in VS Code and select Agent mode.
Paste this one line and send it. Copilot reads the skill itself; nothing to download.
Send this message
Go and read https://raw.githubusercontent.com/microsoft/aibast-agents-library/main/skills/aibast-easy-mode/SKILL.md and run the Building Permit Processing workshop for me.
Expected result
Copilot says it has read the skill and is running the workshop. The skill owns the remaining setup and validation.
3
Prove the solution locally
Ask Easy Mode to build and test Building Permit Processing
This step proves the portable business logic before any Copilot Studio work begins. The harness retrieves the immutable package, verifies the source, loads the agent, and runs every locked case.
Send this message
Give me Building Permit Processing using Easy Mode and test it for me.
Expected result
Copilot reports a verified source and 10/10 locked local cases passed.
Copilot should end by suggesting the next message: Deploy it into Copilot Studio for me.
4
Create the reviewed Draft
Deploy the already-tested solution to Copilot Studio
The harness now uses the verified Microsoft Copilot Studio plugin to reuse or create the source-controlled Draft, synchronize the reviewed instructions and assets, validate the PAC project, and leave publication off.
Send this message
Deploy it into Copilot Studio for me.
Expected result
Draft: Building Permit Manual Build
Model: Claude Opus 5
Knowledge files: 2
Skills: 12
Status: Draft; published: false
The harness then validates the real Preview front door before returning its final verdict.
5
Verify the real experience
Confirm the Draft in Copilot Studio Preview
The harness already runs these checks automatically. Repeat them here so you understand what was proven and can recognize a correct result yourself.
Open the validated Draft.
Select Preview.
Choose New chat before each case.
Paste the exact prompt.
Compare the answer with the required and forbidden markers.
Every case passes in a fresh Preview conversation, and the agent still appears as Draft.
BPP-01 · Development Services Director
Confirm the expected evidence
Which permit applications have been sitting too long, and which resident is going to complain first?
Must include
BP-2025-0104Metro School Districtoverdue
Must not claim
I don't have accessgive me a permit IDshare the fileIssue theCommunicateSend thedate todayupdate was sent
Visible positive anchors: BP-2025-0104; overdue; Metro School District. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-02 · Permit Technician
Confirm the expected evidence
Anything at the front counter I should not be accepting today?
Must include
BP-2025-0105duplicate
Must not claim
I don't have accesswhich permit
Visible positive anchors: BP-2025-0105; duplicate. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-03 · Permit Technician
Confirm the expected evidence
The restaurant fit-out on Harbor Way just came in. Who needs to review it and when is it due back?
Must include
ZoningFire/Life Safety21
Must not claim
I don't have access
Visible positive anchors: Zoning; Fire/Life Safety; 21. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-04 · Customer Service Lead
Confirm the expected evidence
My front desk is drowning in status calls. What can we send out today so people stop calling?
Must include
BP-2025-0104Greenfield
Must not claim
I don't have accessI cannot
Visible positive anchors: BP-2025-0104; Greenfield. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-05 · Chief Building Inspector
Confirm the expected evidence
What inspections are on the board for the solar job, and who is covering them?
Must include
Dave Martinez
Must not claim
I don't have access
Visible positive anchors: Dave Martinez. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-06 · Permitting Supervisor
Confirm the expected evidence
A new residential addition application just came in. Process it and tell me if it is complete.
Must include
Johnson ResidenceHOA approval$847
Must not claim
I don't have accesswhich permit
Visible positive anchors: Johnson Residence; HOA approval; $847. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-07 · Permitting Supervisor
Confirm the expected evidence
Run the code compliance check on the Johnson addition plans.
Must include
247 code requirementsNEC 210.81-2 days
Must not claim
I don't have accesswhich permit
Visible positive anchors: NEC 210.8; 1-2 days. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-08 · Permitting Supervisor
Confirm the expected evidence
Route the Johnson addition for expert plan review.
Must include
Mike ChenSarah MartinezDavid Park
Must not claim
I don't have accesswhich permit
Visible positive anchors: Mike Chen; Sarah Martinez; David Park. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-09 · Permitting Supervisor
Confirm the expected evidence
Track the approval workflow for the Johnson addition.
Must include
Day 3 of ProcessingBoth corrections addressedtomorrow 9 AM
Must not claim
I don't have accesswhich permit
Visible positive anchors: Day 3 of Processing; tomorrow 9 AM; Both corrections addressed. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
BPP-10 · Permitting Supervisor
Confirm the expected evidence
Show me the permit issuance package for the Johnson addition.
Must include
4.5 daysFoundationDraft Citizen Notification
Must not claim
I don't have accesswhich permit
Visible positive anchors: Foundation; Draft Citizen Notification. The screenshot supports the learner checkpoint; the full case pass remains the deterministic machine gate. Source: 1424×863 JPEG. Download original.
6
Recognize completion
Know what “done” looks like
The workshop is complete only when both the portable agent and the Copilot Studio front door prove the same behavior.
Local proof10/10 locked cases passedPreview proof10/10 locked cases passedDraft identityBuilding Permit Manual BuildModelClaude Opus 5Inventory2 knowledge · 12 skillsPublication gateDraft · published false
The harness reports status: complete, exact case totals, the Draft identity, and published: false. The module ends here; it does not offer publication.
Troubleshooting
What you see
What it means
What to do
Copilot ignores the workshop
The wrong skill was read, or the chat began before the one line was sent.
Start a new Agent-mode chat and send the one line first.
Local validation is not 10/10
The portable source, package, or locked behavior does not match.
Stop. Do not deploy. Let the harness report the exact failed case and marker.
No active Copilot Studio environment
PAC has no selected environment.
Sign in or select the intended environment, then resend the deploy message.
The Draft already exists
The recorded schema is already in the environment.
The harness should clone and reconnect automatically. Treat an attendee choice prompt as a harness defect.
A Preview case misses a marker
The real front door does not match the reviewed contract.
Keep the case failed. Inspect instructions and assets; do not retry until it happens to pass.
The agent is Published
The workshop crossed its safety boundary.
Stop immediately. The module must end at Draft with published: false.
Facilitator evidence and portable download
These links support audit, troubleshooting, and offline delivery. They are not learner steps.
See how Building Permit Processing Agent is built, one capability at a time.
Optional. Easy mode already did all of this for you from one skill file. This path replays every action the AI took, one real browser frame per step, so you can understand the agent before you adapt it. No PAC CLI, YAML import, or plugin architect; stop at Draft.
Synthetic disclosure: this is qualitative workflow evidence using packaged synthetic inputs. It is not a customer KPI or a live-system result.
Found something inaccurate? Use Report an issue on that step. It opens a prefilled GitHub issue for review and does not submit automatically.
Manual-mode progress is saved on this device and contributes to the same achievement profile.
Build and verify
1
Create a blank Copilot Studio agent
Step 1 of 34
Action
Create a blank Copilot Studio agent
Expected resultA blank Copilot Studio agent is visible in the captured Draft workspace.
Positive visual checkpoint: Untitled Agent. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
2
Name Building Permit Manual Build
Step 2 of 34
Action
Building Permit Manual Build
Name Building Permit Manual Build
Expected resultThe page header shows the recorded manual build name: Building Permit Manual Build.
Positive visual checkpoint: Building Permit Manual Build. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
3
Enter the reviewed global instructions
Step 3 of 34
Action
# Building Permit Manual Build - Global Instructions
## Role
You are Building Permit Manual Build, an operational decision-support agent for a
fictional local-government development services office. Help permit
technicians, reviewers, customer-service staff, managers, and inspectors
understand permit intake, review clocks, applicant updates, permit status,
review checklists, inspection coverage, and estimated fees.
## Pilot data boundary
- Use only the synthetic records, schedules, standards, and procedures
packaged with this project.
- Treat 2026-08-07 as the fixed snapshot date. Do not recalculate ages,
overdue days, complaint-risk rankings, inspection dates, or intake due dates
from the current date.
- Every applicant, address, parcel, permit, reviewer, inspector, fee, zoning
standard, and date is fictional.
- Never claim access to Dynamics 365, SharePoint, Teams, an MCP server, or any
other live municipal or customer system.
- End every substantive answer with:
`> Synthetic pilot data as of 2026-08-07; no live municipal system was accessed or changed.`
## Natural-language routing
Decide the workflow from the user's intent. Never require an operation name or
a permit ID when a street, applicant, project type, job nickname, or work
context identifies the record.
- Use permit backlog analysis for applications sitting too long, statutory
clocks, complaint risk, or "who will call first." Load
`permit-backlog-and-complaint-risk` before any generic helper.
- Use intake triage for new arrivals, documents, duplicates, routing desks, or
target dates. "The restaurant fit-out on Harbor Way" is BP-2025-0106.
- Use applicant updates for proactive status drafts. Never claim an update was
sent.
- Use permit status for a permit, applicant, address, parcel, project, or full
dashboard request.
- Use review checklist for review scope or required review items.
- Use inspector assignment for the inspection board, specialties, capacity,
zones, or job coverage. "The solar job" is BP-2025-0103.
- Use fee calculation for estimates, breakdowns, or formula explanations.
- The new residential addition (Johnson Residence, 123 Oak Lane) is BP-2024-3847.
Walk it with: application intake (process the new application), code
compliance review, plan review routing (route for expert review), approval
workflow tracking (track the workflow), and permit issuance package (show
permit issuance). These are prepared for staff; never claim a permit was
issued, a reviewer assigned, an inspection booked, or a message sent.
Preserve all twelve portable-source workflows: `permit_backlog`,
`intake_triage`, `applicant_updates`, `permit_status`, `review_checklist`,
`inspector_assignment`, `fee_calculation`, `application_intake`,
`code_compliance_review`, `route_for_review`, `workflow_timeline`, and
`permit_issuance`.
Continue the agentic loop when a request needs more than one workflow. Ask one
concise clarification only when the packaged facts cannot identify the permit
or requested output.
## Locked backlog response contract
For the exact prompt `Which permit applications have been sitting too long,
and which resident is going to complain first?`, retrieve `BPP-01 Locked
Response` from the synthetic permit records and reproduce only that reviewed
response.
Do not rewrite, expand, summarize, or supplement the locked response. Do not
tell staff to issue, communicate, send, escalate, assign, schedule, or change
anything. Keep every next step recommendation-only and preserve the exact
municipal-system footer.
## Decision and safety rules
1. Lead with the operational decision or most important finding, then the
supporting facts.
2. Name the relevant permit ID and applicant, reviewer, or inspector.
3. Report facts and recommendations only. Never approve, deny, issue, reopen,
or modify a permit; accept or reject a submission in a system; assign a
reviewer or inspector; book, reschedule, or cancel an inspection; send a
message; or invoice, collect, waive, reduce, or refund a fee.
4. Distinguish recommendations from completed actions with phrases such as
"Recommended decision," "Draft update," and "Suggested next step."
5. Do not invent permits, applicants, parcels, documents, routing desks,
standards, reviewers, inspectors, dates, statuses, or calculations.
6. Quote zoning standards as synthetic references, not compliance findings.
Never provide legal advice or certify code compliance.
7. For unknown IDs or ambiguous projects, state what is missing and list the
known matching records rather than substituting another permit.
8. Fees are estimates from declared valuation using the packaged synthetic
schedule, never invoices or payment records.
## Response style
Use concise Markdown. Prefer a short decision statement followed by bullets or
a compact table. Use dates as YYYY-MM-DD and currency with separators. Avoid
generic preambles, filler, and unsupported policy language.
## Customer-safe demo language
When a seller asks for copy-ready demo wording, return these statements without
adding a live-deployment, customer-validation, or production-results claim:
- **Opening:** This is a Draft workshop agent using fictional permit records.
It is not connected to your systems and cannot send messages or change
permits.
- **During the demo:** The agent is recommending a next step from synthetic
data. A person must review every recommendation before any real action.
- **Close:** This demonstrates the workflow shape only. Production use requires
approved read-only connections, security and governance review, telemetry,
and separate human approval before any write.
## Production seams
A production implementation can replace the packaged permit records with
Dynamics 365 Customer Service, plan and policy documents with SharePoint, and
notifications or field coordination with Microsoft Teams-backed tools. These
are future integration seams only; no live connector is configured. Start any
approved production connection in read-only mode. Keep external writes disabled
until they pass separate governance review and require explicit human approval.
Enter the reviewed global instructions
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Positive visual checkpoint: Building Permit Manual Build - Global Instructio. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
4
Save the instruction policy
Step 4 of 34
Action
Save the instruction policy
Expected resultThe reviewed manual/GLOBAL-INSTRUCTIONS.md policy is visible or saved without unrecorded edits.
Positive visual checkpoint: Draft. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
5
Remove default web search
Step 5 of 34
Action
Remove default web search
Expected resultThe captured inventory no longer lists the default web-search capability.
Positive visual checkpoint: Provide trusted context to guide decisions. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: aibast_permit-rules-and-schedules.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Expected resultThe exact knowledge file linked for this step is attached under its complete filename. Wait for processing to finish before continuing. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: aibast_building-permit-synthetic-records.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
8
Add skill: aibast_applicant-updates_bp03
Step 8 of 34
Action
Add skill: aibast_applicant-updates_bp03
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: proactive-applicant-updates. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
9
Add skill: aibast_application-intake_bp08
Step 9 of 34
Action
Add skill: aibast_application-intake_bp08
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: new-application-intake-check. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
10
Add skill: aibast_code-compliance-review_bp09
Step 10 of 34
Action
Add skill: aibast_code-compliance-review_bp09
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: automated-code-compliance-review. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
11
Add skill: aibast_fee-calculation_bp07
Step 11 of 34
Action
Add skill: aibast_fee-calculation_bp07
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: synthetic-permit-fee-estimate. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
12
Add skill: aibast_inspector-assignment_bp06
Step 12 of 34
Action
Add skill: aibast_inspector-assignment_bp06
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: inspector-board-and-coverage. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
13
Add skill: aibast_intake-triage_bp02
Step 13 of 34
Action
Add skill: aibast_intake-triage_bp02
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: intake-triage-and-review-routing. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
14
Add skill: aibast_permit-backlog_bp01
Step 14 of 34
Action
Add skill: aibast_permit-backlog_bp01
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: permit-backlog-and-complaint-risk. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
15
Add skill: aibast_permit-issuance_bp12
Step 15 of 34
Action
Add skill: aibast_permit-issuance_bp12
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: permit-issuance-package. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
16
Add skill: aibast_permit-status_bp04
Step 16 of 34
Action
Add skill: aibast_permit-status_bp04
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: permit-status-and-zoning-detail. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
17
Add skill: aibast_review-checklist_bp05
Step 17 of 34
Action
Add skill: aibast_review-checklist_bp05
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: permit-review-checklist. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
18
Add skill: aibast_route-for-review_bp10
Step 18 of 34
Action
Add skill: aibast_route-for-review_bp10
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: plan-review-routing. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
19
Add skill: aibast_workflow-timeline_bp11
Step 19 of 34
Action
Add skill: aibast_workflow-timeline_bp11
Expected resultThe linked SKILL.md appears with its frontmatter name and description. Open it and compare the complete instructions with the source file. This step does not require the final inventory or prove the other uploads.
Positive visual checkpoint: approval-workflow-tracking. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
20
Review model, skills, knowledge, and safety boundaries
Step 20 of 34
Action
Review model, skills, knowledge, and safety boundaries
Expected resultThe screenshot visibly confirms Claude Opus 5, 12 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Positive visual checkpoint: Claude Opus 5; approval-workflow-tracking; plan-review-routing; permit-review-checklist; permit-status-and-zoning-detail; permit-issuance-package; aibast_building-permit-synthetic-records.md; aibast_permit-rules-and-schedules.md. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
21
Review the skill list (12 skills)
Step 21 of 34
Action
Review the skill list (12 skills)
Expected resultThe screenshot visibly confirms Claude Opus 5, 12 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Positive visual checkpoint: approval-workflow-tracking; plan-review-routing; permit-review-checklist; synthetic-permit-fee-estimate; permit-status-and-zoning-detail. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
22
Review the rest of the skill list
Step 22 of 34
Action
Review the rest of the skill list
Expected resultThe screenshot visibly confirms Claude Opus 5, 12 rendered skills, and no tools. Knowledge is verified separately in the two knowledge-upload checkpoints.
Positive visual checkpoint: synthetic-permit-fee-estimate; automated-code-compliance-review; new-application-intake-check; proactive-applicant-updates. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
23
Open a fresh Preview conversation
Step 23 of 34
Action
Open a fresh Preview conversation
Expected resultA fresh Preview surface or its recorded qualitative result is visible; only the evidence file defines a pass.
Positive visual checkpoint: Building Permit Manual Build. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
24
Pass BPP-01: Development Services Director
Step 24 of 34
Action
Which permit applications have been sitting too long, and which resident is going to complain first?
Pass BPP-01: Development Services Director
Expected resultThe captured Preview evidence records BPP-01 with the recorded identifiers BP-2025-0104, Metro School District, overdue; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-01. A previous response must not influence the evidence.
Positive visual checkpoint: BP-2025-0104; overdue; Metro School District. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
25
Pass BPP-02: Permit Technician
Step 25 of 34
Action
Anything at the front counter I should not be accepting today?
Pass BPP-02: Permit Technician
Expected resultThe captured Preview evidence records BPP-02 with the recorded identifiers BP-2025-0105, duplicate; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-02. A previous response must not influence the evidence.
Positive visual checkpoint: BP-2025-0105; duplicate. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
26
Pass BPP-03: Permit Technician
Step 26 of 34
Action
The restaurant fit-out on Harbor Way just came in. Who needs to review it and when is it due back?
Pass BPP-03: Permit Technician
Expected resultThe captured Preview evidence records BPP-03 with the recorded identifiers Zoning, Fire/Life Safety, 21; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-03. A previous response must not influence the evidence.
Positive visual checkpoint: Zoning; 21; Fire/Life Safety. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
27
Pass BPP-04: Customer Service Lead
Step 27 of 34
Action
My front desk is drowning in status calls. What can we send out today so people stop calling?
Pass BPP-04: Customer Service Lead
Expected resultThe captured Preview evidence records BPP-04 with the recorded identifiers BP-2025-0104, Greenfield; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-04. A previous response must not influence the evidence.
Positive visual checkpoint: BP-2025-0104; Greenfield. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
28
Pass BPP-05: Chief Building Inspector
Step 28 of 34
Action
What inspections are on the board for the solar job, and who is covering them?
Pass BPP-05: Chief Building Inspector
Expected resultThe captured Preview evidence records BPP-05 with the recorded identifiers Dave Martinez; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-05. A previous response must not influence the evidence.
Positive visual checkpoint: Dave Martinez. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
29
Pass BPP-06: Permitting Supervisor
Step 29 of 34
Action
A new residential addition application just came in. Process it and tell me if it is complete.
Pass BPP-06: Permitting Supervisor
Expected resultThe captured Preview evidence records BPP-06 with the recorded identifiers Johnson Residence, HOA approval, $847; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-06. A previous response must not influence the evidence.
Positive visual checkpoint: HOA approval; Johnson Residence; $847. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
30
Pass BPP-07: Permitting Supervisor
Step 30 of 34
Action
Run the code compliance check on the Johnson addition plans.
Pass BPP-07: Permitting Supervisor
Expected resultThe captured Preview evidence records BPP-07 with the recorded identifiers 247 code requirements, NEC 210.8, 1-2 days; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-07. A previous response must not influence the evidence.
Positive visual checkpoint: 247 code requirements; NEC 210.8; 1-2 days. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
31
Pass BPP-08: Permitting Supervisor
Step 31 of 34
Action
Route the Johnson addition for expert plan review.
Pass BPP-08: Permitting Supervisor
Expected resultThe captured Preview evidence records BPP-08 with the recorded identifiers Mike Chen, Sarah Martinez, David Park; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-08. A previous response must not influence the evidence.
Positive visual checkpoint: Mike Chen; Sarah Martinez; David Park. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
32
Pass BPP-09: Permitting Supervisor
Step 32 of 34
Action
Track the approval workflow for the Johnson addition.
Pass BPP-09: Permitting Supervisor
Expected resultThe captured Preview evidence records BPP-09 with the recorded identifiers Day 3 of Processing, Both corrections addressed, tomorrow 9 AM; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-09. A previous response must not influence the evidence.
Positive visual checkpoint: Day 3 of Processing; Both corrections addressed; tomorrow 9 AM. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
33
Pass BPP-10: Permitting Supervisor
Step 33 of 34
Action
Show me the permit issuance package for the Johnson addition.
Pass BPP-10: Permitting Supervisor
Expected resultThe captured Preview evidence records BPP-10 with the recorded identifiers 4.5 days, Foundation, Draft Citizen Notification; do not infer results beyond it.
Before this case
Open Preview in a fresh conversation before running BPP-10. A previous response must not influence the evidence.
Positive visual checkpoint: 4.5 days; Foundation; Draft Citizen Notification. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
34
Confirm Draft and stop before publish
Step 34 of 34
Action
Confirm Draft and stop before publish
Expected resultThe agent remains Draft and no Publish action is taken.
Positive visual checkpoint: Building Permit Manual Build. Source capture: 1424×863 JPEG. The full pass remains the deterministic machine gate. Download original.
Manual-mode troubleshooting
A screenshot or browserfilm frame is missing
Stop. Do not invent, recreate, or substitute an image. Capture the real frame, update the browserfilm manifest, and regenerate without --allow-pending.
A knowledge file is still processing
Wait for ingestion to finish before Preview. A partial answer is not evidence.
A skill upload fails
Use the linked raw SKILL.md. Fix the reviewed source deliberately; do not silently skip the action.
The model differs from Easy mode
Record the substitution and stop the parity claim until Easy and Manual use the same reviewed model.
The Preview answer misses an identifier
Mark the recorded case failed, inspect instructions and inventory, then replay the exact prompt in a fresh conversation.
Should I publish?
No. Keep this manual duplicate in Draft unless publication is separately approved. Do not choose Publish as part of this tutorial.